General Upload page for fully analyzed MS data Machine Studies General Topics analyzed data by date 2009 * MS 2009 General 2008 * MS 2008 General 20...
May 04, 2005 BSM23W beamsize for 7x5 pretzel on/off * Measurement results for different electron currents (no positrons) can be found in this pdf file Main.E...
May 10, 2005 BSM23W noise measurements (no beam and only positrons in machine) * Noise measurement results for no beam and positrons only (arranged in 9x5) can...
June 21, 2005 BSM23W beamsize measurements before and after rail displacement * Beamsize measurements before and after rail displacement can be found in this p...
June 23, 2005 BSM23W beamsize measurements after change of beamsplitter * Beamsize measurements after change of beamsplitter can be found in this pdf file Ma...
June 24, 2005 BSM23W single bunch turn by turn beamsize measurements * Single bunch turn by turn beamsize measurements can be found in this pdf file Main.Eug...
May 24, 2005 BSM23W noise measurements (disconnecting/reconnecting cables) * Noise measurement results for disconnected/reconnected HV and flat cable can be fo...
June 25, 2005 BSM23W single bunch turn by turn beamsize measurements (triggered by trigger bit 1) * Single bunch turn by turn beamsize measurements (triggered ...
May 31, 2005 BSM23W noise measurements (beam pipe window covered/not covered) * Noise measurement results for the beam pipe window covered/not covered can be f...