November 2006
November 2, 2006 e+/e- Vertical Beam Dynamics during CHESS Operation
November 16, 2006 e+/e- Vertical Beam Dynamics during CHESS Operation-Part 2
October 2006
October 3, 2006 CHESS Differential Coupling and Vertical Beam Size Study
October 5, 2006 CHESS Vertical Beam Size Study, 10k turns of raw data
October 10, 2006 CHESS Differential Coupling and Vertical Beam Size Study: e+ with e-, e+ only
October 12, 2006 CHESS Turn-by-turn Vertical Beam Size Study
October 17, 2006 CHESS Differential Coupling and Vertical Beam Size Study: e+ with e-, e- only
October 24, 2006 CHESS Differential Coupling and Vertical Beam Size Study: e+ with e-, e+ only, RF change
October 31, 2006 CHESS Differential Coupling and Vertical Beam Size Study: e+ with e-, e+ only, V tune change
August 2006
August 1, 2006 CESR-c Colliding Beams measurements
August 3, 2006 CESR-c Colliding Beams measurements
ms08312006.pdf
: August 31, 2006 CESR-c Colliding Beams measurements
May 2006
May 16, 2006 Effect of septum on electrons (size and position)
February 2006
February 26, 2006 BSM23W beam size measurements at the beginning and end of a run
Attachments
1
Attachments
1
Topic attachments
I
Attachment
Action
Size
Date
Who
Comment
ppt
MS10032006.ppt
manage
279 K
08 Oct 2006 - 20:23
UnknownUser
CHESS Differential Coupling and Vertical Beam Size Study
This topic: ACC/Bunch
>
WebHome
>
General
>
CESR_MS_2006_General
Topic revision:
15 May 2007,
RobertHoltzapple
Copyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding CLASSE Wiki?
Send feedback