ACC/Bunch Web Preferences The following settings are web preferences of the ACC/Bunch web. These preferences overwrite the site level preferences in . and ...
Note: All CLASSE VMS systems were shut down on January 17, 2017. The information below is obsolete. From "Readme" file in USER$DISK: CESR.PALMER.TS101.BPM by E....
Note: All CLASSE VMS systems were shut down on January 17, 2017. The information below is obsolete. From "Readme" file in USER$DISK: CESR.PALMER.TS101.BSM by E....
. Top Level Functions Function Name AcquireAndShowXFERData Acquire data from $CESR_OFFLINE\instr\anal\cbpmII\diag\XFER_BPM_Matlab_Data, and plot it. ...
How To Setup Coldfire 1. Place the Coldfire board into DIMM slot on the I/O Board. 2. Plug the XBUS/MOXA cable, Ethernet, and Power all into the I/O Bo...
... CBIC Function tree (incomplete), might have useful info for understanding this page: https://wiki.classe.cornell.edu/ACC/Bunch/FunctionTree ... CBIC Start Cy...
... Take Pedestals. Save and install them. Load T1B1 Positrons (14nS LDINIT), Fill to 0.75 mA, turn Separators OFF Time in 14ns_FIX_G (Block A), Save Timing...
Ensure there is no beam in CESR On first the West, then the East: 1 ACQUIRE PEDESTAL(19) 1 SAVE PEDESTAL PARAMETERS(10) 1 INSTALL UPDATED PARAMETERS(23) ...
Once David Rubin provides a gain calibration file to update BPM gains, use the ln command to create a symbolic linkfirst use the mv command like this:mv gain_cal_...
https://cesrwww.lepp.cornell.edu/logs/Instrumentation/895 Diagnostic output from running cbic with the " h" flag: TimeScanDiagnosticsDocOutput.txt Time_Scan_Erro...
********************************************** This mirrors all block A timing values into timing block B for efficiency in acqiring calibration data. The und...
Sequence type encountered with 4 steps. *********************************************************** Install Turn By Turn Bunch = Multibunch Turn By Turn Data A...
Prep() function status = 0 Copying and transferring structure set... Post function loop... INFO 07/28/14 16:28:28 : = Test Life Command Status Summary = I...
Timing setup is presently: 5 14ns_FIX_G ******************************************************* This shifts the waveform sample point on BLOCK A and B for a...
Prep() function status = 0 Copying and transferring structure set... Initializing command... Executing command... Waiting for handshake completion... CMD_D...
Timing setup is presently: 5 14ns_FIX_G ******************************************** This mirrors all block A timing values into timing block B for efficien...
Enter timing block to scrub block A = 0, block B = 1 : Prep() function status = 0 Copying and transferring structure set... Post function loop... TIMING setu...
Would you like to apply the gain mapping corrections from the file ./gain_cal_mapping.in to existing parameters for all instruments COMMON to the master paramet...
Would you like to replace all gain tables in the existing set of parameters with those that appear in the file ./gain_cal_electronic.in and save the result to a...
Sequence type encountered with 8 steps. Select the desired timing conditions: 1 = Positrons, 4nSec, timing block A Variable Gain 2 = Positrons, 4nSec, tim...
Sequence type encountered with 6 steps. Would you like to cycle power for ALL active instruments? (y/n): n : y Turning off power to all active instruments... Wai...
Sequence type encountered with 5 steps. Skipping communication connect! Copying and transferring structure set... Post function loop... INFO 07/28/14 15:26:...
Would you like to begin the flash programming process for ALL active instruments? (y/n): n : y Prep() function status = 0 Copying and transferring structure set...
Copying and transferring structure set... Post function loop... Closing all open sockets to instruments. Resetting the Coldfire/CBInet server via XBUS for instru...
Would you like install the changes present in file: /nfs/cesr/online/instr/CBPM/config/09/instrument_parameters.009780 into the master operational parameters f...
Copying and transferring structure set... Post function loop... Instrument heartbeat: OK! Timing integrity : GOOD Turns seen: 39013 INFO 07/28/14 15...
Copying and transferring structure set... Post function loop... INFO 07/28/14 15:18:53 : = DUMP RAW DATA Command Status Summary = Instrument Location ...
INFO cbi_cesr_interface: CBPM CONTROL INTERFACE ACTIVE INFO 07/28/14 15:13:38 cbi_cesr_interface: exits server mode ^C INFO cbi_cesr_interface: Exiti...
Copying and transferring structure set... Initializing command... Executing command... Waiting for handshake completion... CMD_DONE (3) Post function loop....
Copying and transferring structure set... Initializing command... Executing command... Waiting for handshake completion... CMD_DONE (3) Post function loop...
********* SET GAIN ************* All channels will be set to the same gain. Enter a gain setting index between 1 and 10 inclusive 4 : Prep() function status =...
Would you like to save the pedestal tables to an intermediate file? (y/n): n : y MailboxID = 0 Saving pedestal tables to intermediate file: /nfs/cesr/online/ins...
Would you like to save the timing parameters to an intermediate file? (y/n): n : y MailboxID = 0 Saving timing parameters to intermediate file: /nfs/cesr/online...
******* GET BETATRON PHASE ***** This will calculate the betatron phase coefficients for a single bunch of either species, and generate setup/comparison coeffic...
******* PROCESSED DATA ***** Enter species POSITRONS=0, ELECTRONS=1 0 : species = (0) POSITRONS Enter the number of each bunch you wish to examine, each foll...
******* FIND BLOCK TURN MARKER DELAY ****** Will use cached channel delays. Checking timing setup of the first active device. Startup checks shall have ensured ...
******* RAW DATA ***** (l)oad predefined, (i)ndividual bunch selection, (r)ange of bunches Specify the bunch pattern entry method: l : input = l Avai...
******* TEST RAW DATA ******** Enter value to use for scrubbing 123 : Prep() function status = 0 Copying and transferring structure set... Initializing comm...
********FIND BUNCH**************** Channel delays are being set on the instrument. Enter species POSITRONS=0, ELECTRONS=1 0 : species = (0) POSITRONS Enter num...
RTEMS Coldfire Development Environment on the CESR Control System Overview Instrumentation in the CESR control system frequently uses the RTEMS operating system ...
Inventory of Motorola uCdimm modules used for CBI purposes How to connect to the serial port of a Coldfire modules using the terminal server Table with connect...
General Upload page for fully analyzed MS data Machine Studies General Topics analyzed data by date 2009 * MS 2009 General 2008 * MS 2008 General 20...
Main.rlh 01 May 2009 January 2009 * Results: Electron cloud tune shift measurements systematic studies, and studies of tune shift vs. current in long trains 1...
This is a subscription service to be automatically notified by e mail when topics change in this ACC/Bunch web. This is a convenient service, so you do not have t...
Main.rlh 08 Mar 2008 March 2008 * Results: 45 bunch train e /e CESR c beam dynamics 3/1/2008 April 2008 * Results: e beam dynamics for 45 bunch trai...
CHESS X Ray BSM hutch B1 Electronic Logbook 2006 2007 May 2008 Jim's log book (32pg, pdf format) from the first CesrTA running time, May 19 23 is here November...
The datafiles are the payload of the CBPM II system and through their analysis it is intended that phenomena in the accelerator may be identified and characterize...
Ecloud Upload page for single snapshots of analyzed data Ecloud Machine Studies snapshots uploads by date 2008 * MS 2008 Ecloud snapshots 2007 * MS 2...
MPMnet What is MPMnet? MPMnet which means multi port memory net presents an Ethernet interface to the CESR MPM system 1 . Usually MPM is supported only on V...
Ethernet for DSP See also CBI_NET documentation. December 2006 December 06, 2006 (E. Tanke): Testing of data transfer rates for BSM to linux and VMS * Data ...
Main.rlh 10 Jan 2008 January 2008 * Results: e PMT Calibration 1/9/2008 * Results: e PMT/Interferometer comparison 1/22/2008 February 2008 * Results:...
Longitudinal Dynamics Upload page for fully analyzed data Longitudinal Dynamics Machine Studies for fully analyzed data 2007 July 2007 * Results: Poisson...
CBPM II DSP Test Program Pairs This is a list of test program pairs to be used to exercise targeted functionality in the DSP. Each test requires a custom executa...
Terms: * Unit refers to an entire remote beam instrumentation device containing DSP, digital board, timing board, and analog input hardware. Abbreviations: * ...
Core DSP Functions Timing Scan The timing scan is used to grab ADC data, average it over a certain number of turns on all channels. Timing step size is supplied...
Second Generation (CBPM II) Software * Algorithms and Command / Control * Generalized DSP Executable * DSP Test Programs * General Utilities Developm...
uClinux Operating System for Arcturus uCdimm Coldfire 5282 SBC Overview The uCdimm single board computer by Arcturus Networks is based on a Freescale Coldfire M...
Visual DSP This is the development environment for code that runs on the Analog Devices digital signal processor chips used in instrumentation devices. The most ...
CBPM II Utilities Several utilities exist to control the set up and non acquisition / preprocessing behavior of the CBPM II units. Hardware Module Related Nam...
From "Readme" file in USER$DISK: CESR.PALMER.TS101.BPM by E.Tanke ************ CESR BPM DAQ program (controls side) *********************************...
From "Readme" file in USER$DISK: CESR.PALMER.TS101.BSM by E.Tanke *************************************************************************************** ...
From "Readme" file in USER$DISK: CESR.PALMER.TS101.BSM by E.Tanke ...11 Jun 2007 *************************************************************************** *...
* User requirements for instrumentation, G. Codner, 04/05/05:CBPM_REQ_050405.ppt DSP * Algorithms and Command Control * DSP main loop concepts, M. Palme...
The CBPM Generation I system uses a standardized client server model to facilitate the taking of measurements. The client runs as an executable image in the DSP a...
Making Beam Measurements with CBPM II Devices This document pertains to running programs on VMS. Each hardware type has a directory named CESR.PALMER.TS101.{XX...
2006 CesrTA Instrumentation Project Student: Joseph Burrell (Wayne State University) Mentors: Mark Palmer, Eugene Tanke, John Dobbins, and Charlie Strohman Proj...
Minutes for April 7, 2006 * Tim: Rebooting the coldfire in the DAQ lab didn't work: the DSP module was lacking a necessary update. This has been fixed now. The...
Ethernet for DSP December 2006 December 06, 2006 (E. Tanke): Testing of data transfer rates for BSM to linux and VMS * Data transfer for 32 channels by 5230...
CBPM Beam Position Monitor Electronic Logbook Description This log book is for monitoring work done with the 1st generation bunch by bunch CBPM system. Feb...
Longitudinal Dynamics Upload page for snapshots of analyzed data Longitudinal Dynamics Machine Studies snapshots uploads by date 2007 October 2007 * Results:...
January 2007 * January 30, 2007 CESR c Ecloud Results, e 14,28,42 ns bunch spacing * January 31, 2007 CESR c Ecloud Results, e , e with witness bunch Ma...
Fast Luminosity Monitor Electronic Logbook 2007 May 2007 May 9, 2007 T. Wilksen Checked newly installed Motorola Coldfire module (Ethernet based read out) f...
CESR Bunch Instrumentation System Documentation Introduction The following Wiki pages document the existing CESR Bunch Instrumentation System (largest number ...
BSM23E Vertical Beamsize Monitor Electronic Logbook 2007 January 2007 January 2, 2007 (C.Strohman, T.Wilksen, E. Tanke): Upgrade of Xlinx and Coldfire softw...
BSM23W Vertical Beamsize Monitor Electronic Logbook 2007 January 2007 January 2, 2007 (C.Strohman, T.Wilksen, E. Tanke): Upgrade of Xlinx and Coldfire softw...
April 02, 2007 CESR c Ecloud Results, e ,e train with witness bunch (14 ns nominal bunch spacing); First 4 ns bunch spacing test Vertical tune data from BPM6W...
BPM6W1 Beam Position Monitor Electronic Logbook 2007 January 2007 January 2, 2007 (C.Strohman, T.Wilksen, E. Tanke): Upgrade of Xlinx and Coldfire software ...
ERLBPM Electronic Logbook 2007 May 2007 May 15, 2007 Testing of ERL BPM using a signal generator in preparation for tests with beam * Some miscellaneou...
BSM23E Vertical Beamsize Monitor Electronic Logbook 2006 February 2006 February 07, 2006 (E. Tanke): BSM23E DSP node name * The database node name reser...
BSM23W Vertical Beamsize Monitor Electronic Logbook 2006 January 2006 January 20, 2006 (E. Tanke): CHESS X ray BSM * This week cables have been pulled t...
November 2006 * November 2, 2006 e /e Vertical Beam Dynamics during CHESS Operation * November 16, 2006 e /e Vertical Beam Dynamics during CHESS Operation...
ERLBPM Electronic Logbook 2006 November 2006 November 27, 2006 (E. Tanke): ERL BPM status * Front end filters were added to the 4 ADC boards last week ...
BSMXB1 Xray Beamsize Monitor Electronic Logbook 2007 January 2007 January 2, 2007 (C.Strohman, T.Wilksen, E. Tanke): Upgrade of Xlinx and Coldfire software ...
March 13, 2007 CESR c Ecloud Results, e , e with witness bunches * e tune03132007.ppt: e tunes with witness bunches * e tune03132007.ppt: e tunes with w...
January 31, 2007 CESR c Ecloud Results, e , e with witness bunch * Beam size (e and e ) * Comparison of beam size data (based on Levi Schaechter's fitter...
January 30, 2007 CESR c Ecloud Results, e 14,28,42 ns bunch spacing * Beam size data * Comparison of beam size data (based on Levi Schaechter's fitter) ...
e /e Vertical Beam Dynamics during CHESS Operation (9x6 bunch pattern, 9k turns of raw data) Part 2 * MS11162006.ppt: Results ppt format without movies * M...
Damping Time Upload page for fully analyzed data Machine Studies Damping Time analyzed data by date 2007 * MS 2007 Damping 2006 * MS 2006 Damping 20...
September 6, 2006 CESR c e /e 45 bunch train vertical beam size with all wigglers on and 6 wigglers off * Preliminary results in this PPT file * More deta...
e /e Vertical Beam Dynamics during CHESS Operation (9x6 bunch pattern, 9k turns of raw data) * MS11022006.ppt: Results ppt format without movies * MS110...
Fast Luminosity Monitor Electronic Logbook 2006 January 2006 January 3, 2006 (J. Dobbins, C. Strohman, M. Palmer, E. Tanke): New FLMA with accumulator boar...
* Differential Coupling and Vertical Beam Size Study: e with e , e only, V tune change * Results from turn by turn data with movies (pdf) * Results ...
* Differential Coupling and Vertical Beam Size Study: e with e , e only, RF change * Results from turn by turn data * Results from averaged data (pp...
CHESS Turn by turn Vertical Beam Size During Normal Operations (9x5 bunch pattern, 10k turns of raw data) * CHESS Turn by turn results Main.rlh 01 Nov 2006
Main.rlh 16 Oct 2006 * CHESS Vertical Beam Size During Normal Operations (9x5 bunch pattern, 10k turns of raw data, files 744 (e ) and 745 (e )) in this pdf fi...
September 2006 * September 26, 2006 CHESS Ecloud Results Train of 45 bunches * September 06, 2006 CESR c Ecloud Results Train of 45 bunches, 6 wigglers on a...
August 24, 2006 ECLOUD at low CLEO energy (3686); 6 wigglers low and off * CESR c 45 Bunch Train Vertical Beam Size 08/24/2006: * MS08242006.ppt: MS082...
Minutes for September 08, 2006 * Present: D.Bougie,M.Palmer, C.Strohman, E.Tanke, T.Wilksen * Today is Huberts' last day at Cornell. Jamie will be continuin...
General Upload page for single snapshots of analyzed data General Machine Studies snapshots uploads by date 2006 * MS 2006 General studies snapshots 200...
Damping Upload page for snapshots of analyzed data of Machine Studies 2006 April 2006 * April 24, 2006 CESR c Ecloud (e and e ) and damping time measurem...
Damping Upload page for single snapshots of analyzed data Damping Machine Studies snapshots uploads by date 2006 * MS 2006 Damping snapshots 2005 * M...
Ecloud Upload page for snapshots of analyzed data of Machine Studies 2006 May 2006 * May 23, 2006 Effect of anti solenoid on ecloud (e and e ) * May 1...
May 23, 2006 Effect of anti solenoid on ecloud (e and e ) * CHESS 45 Bunch Train Vertical Beam Size 05/23/2006: Results.pdf Main.EugeneTanke 06 Jun 2006...
April 24, 2006 CESR c Ecloud (e and e ), CHESS 6x5 beam size measurements * CESR c 45 Bunch Train Vertical Beam Size 4/24/2006: Results.pdf * CHESS 6x5 Ve...
Minutes for July 28, 2006 * Discussion on storage of measurement data (i.e. not yet analyzed): We have a 2 GB partition, which is both accessible from CESR29 a...
March 15, 2006 Ecloud electrons 8x3 and 6x5 beam size measurements * Ecloud electrons 8x3 and 6x5 beam size measurements are in this pdf file Main.EugeneTank...
February 27, 2006 BSM23W beam size measurements at the beginning and end of a CHESS run * Multi bunch beam size measurements at the beginning and end of a CHES...
October 2005 * October 05, 2005 BSM23W tune wobble measurements June 2005 * June 25, 2005 BSM23W single bunch turn by turn beamsize measurement (triggered ...
July 2005 * Jul 26, 2005 Electron damping time measurements * Jul 21, 2005 Electron damping time measurements under CHESS conditions * Jul 20, 2005 Elect...
June 25, 2005 BSM23W single bunch turn by turn beamsize measurements (triggered by trigger bit 1) * Single bunch turn by turn beamsize measurements (triggered ...
June 24, 2005 BSM23W single bunch turn by turn beamsize measurements * Single bunch turn by turn beamsize measurements can be found in this pdf file Main.Eug...
June 23, 2005 BSM23W beamsize measurements after change of beamsplitter * Beamsize measurements after change of beamsplitter can be found in this pdf file Ma...
June 21, 2005 BSM23W beamsize measurements before and after rail displacement * Beamsize measurements before and after rail displacement can be found in this p...
May 31, 2005 BSM23W noise measurements (beam pipe window covered/not covered) * Noise measurement results for the beam pipe window covered/not covered can be f...
May 24, 2005 BSM23W noise measurements (disconnecting/reconnecting cables) * Noise measurement results for disconnected/reconnected HV and flat cable can be fo...
May 04, 2005 BSM23W beamsize for 7x5 pretzel on/off * Measurement results for different electron currents (no positrons) can be found in this pdf file Main.E...
May 10, 2005 BSM23W noise measurements (no beam and only positrons in machine) * Noise measurement results for no beam and positrons only (arranged in 9x5) can...
Minutes for June 2, 2006 * Mike Watkins: I now have a fitting code, written in C, which fits 125k turns of single bunch BSM data in about 10 minutes on CESR68....
BSM23W Electronic Log Entry 08 March 2006 March 2006 March 8, 2006 Attempt to Realign e Synchrotron Light Monitor Optics (MAP/EPT/RME/RNC/LMW) * 10:40 ...
Meeting 29 April 2005 2pm Minutes Attendees: Codner, Li, Love, Palmer, Strohman, Schwarthoff, Watkins, Wilksen Beam Size Monitor is installed Mark gave a brief ...
Minutes for May 19, 2006 * Mike Watkins: The fitting code now works and has been used this week for machine studies involving the BSM. Have started to write so...
Minutes for March 24, 2006 * lnx180c now has 1 GBit ethernet to public side in addition to existing ethernet to CESR * /nfs/cesr/instr is a 36GB mount p...
ERL Stripline Development Feedthrough and Stripline R D * stripline2.xls: Stripline Design Spreadsheet * ERL_BPM_Specifications.doc: ERL BPM Specifications...
BPM Detector Issues #BrokenBPM1W Ongoing issues with BPM 1W (Nov Dec 2005) BPM 1W Overview * This is a 6 button detector on the large round beampipe outside ...
Meeting 06 May 2005 2:15pm Minutes Attendees: Strohman, Schwarthoff, Palmer, Li, Tanke, Wilksen, Watkins, Alexander, Rice Assignments for the next two weeks: ...
Schedule for the CESR Bunch by Bunch Instrumentation DAQ Project This page gives a very rough overview of the project schedule and timeline. * Status: 5 Apr 20...