Backlinks to KarlSmolenski in all Webs (Search Main Web only)

No backlinks in this web

Results from CBETA web retrieved at 03:36 (Local)

BC
BNL Collaborators (BC) As part of the Cornell Brookhaven collaboration, CBETA team members from BNL can fill any role, provided they receied the associated traini...
EC
External Collaborator (EC) An EC is from an institution that is not part of CBETA. They are at CBETA to perform CBETA driven research. Participation of ECs is coo...
L2
Commissioning L2 Adam Barnik is the L2 for commissioning. While he is also one of the lead operators, as L2 he has the additional responsibility (a) of training o...
LO
Lead Operator (LO) A lead operator is highly experienced at operating CBETA and is fully qualified for any CBETA operation. The lead operator has primary control ...
PI
Principle Investigators (PI) Provide high level scientific guidance and drive the physics program. PIs set the long term physics goals and approach at the project...
RC
Run Coordinator (PM) Beyond the regular PM responsiobilities documented in CBETA's Project Management Plan, during commissioning the Cornell PM (just refered to a...
SC
Scientific Coordinator (SC) Scientific Coordinators are assigned to each scientific problem under analysis. They lay out the scientific plan for the time allotted...
SO
Support Operator (SO) The support operator is a partner and in safety terms the second person to the LO. Typically the SO will provide operational support to the ...
TSE
Technical Support Expert (TSE) Technical experts on CBETA subsystem that may be required in the control room, but who are not directly running the accelerator. Fo...
Visitor
Visitor – Being a visitor is a status at CLASSE that one obtains by stisfying several saftey and training requirenments. Main.KarlSmolenski 29 Oct 2018
WebStatistics
Statistics for CBETA Web Month: Topic views: Topic saves: File uploads: Most popular topic views: Top contributors for topic save and uploads: ...
Number of topics: 11

Results from ERL/Private web retrieved at 03:36 (Local)

Design2006May11
* Current slit thermal analysis shows 280W/cm^2 max heat flux flow into the water pipe when putting 1.2 kW beam. Can be reduced by adding more copper between the ...
Design2007Feb8
* Need to extend the dump from what the current layout shows to accomodate the drift for beam magnification, dump shielding * 1m shifting of the whole injector...
DiagMtg11Jan2007
January 11, 2007 ERL diagnostics meeting minutes * Present: I.Bazarov, M.Billing, S.Belomestnykh, B.Dunham, J.Dobbins, R.Kaplan, Y. Li, R.Meller, D.Ouzounov, V...
r5 - 19 Jan 2007 - 13:12 by EugeneTanke
DiagMtg16Nov2006
November 16, 2006 ERL diagnostics meeting minutes * Present: J.Barley,I.Bazarov, M.Billing, S.Chapman, T.O'Connell, B.Dunham, J.Dobbins, R.Helmke, Y. Li, D.Ric...
r5 - 17 Nov 2006 - 13:11 by EugeneTanke
DiagMtg21Sep2006
September 21, 2006 ERL diagnostics meeting minutes * Present: J.Barley, I.Bazarov, M.Billing, S.Belomestnykh, J.Dobbins, B.Dunham, R.Helmke, G.Hoffstaetter, M....
ErlCesr01June2005
ERL@CESR Meeting June 1, 2005 The projects for the interim period between Phase 1A and Phase 2 were reviewed. This list is being developed for a meeting with NSF...
ErlCesr02Aug2006
ERL@CESR Meeting August 2 * Georg reported that in the future we will not use bmad files as a basis for layout drawings, but we will rather construct a data ba...
ErlCesr02Mar2005
ERL@CESR Meeting March 2, 2005 Today's Adgenda: Mattias Lieppe discussion of difficulty of developing higher harmonic SRF cavities for bunch flattening Attachme...
ErlCesr04May2005
ERL@CESR Meeting May 4, 2005 Changsheng Song reviewed the current status of the BBU codes and is working on a C implementation of various subroutines that can be...
ErlCesr06Apr2005
ERL@CESR Meeting April 6, 2005 Ivan Bazarov continued the summary of the ERL Workshop at Jefferson Lab Main.KarlSmolenski 07 Apr 2005
ErlCesr06July2005
ERL@CESR Meeting July 6, 2005 Some misc. notes: Main.KarlSmolenski 05 Jul 2005
ErlCesr07May2008
ERL@CESR Meeting May 7, 2008 * News There will be a visit from OSTP (office of science and technology policy) soon, perhaps next week. Maury recently return...
ErlCesr08June2005
ERL@CESR Meeting June 8, 2005 Some misc. notes: * Welcome back to Dick Talman * Welcome to two new REU students ( Nipuna Rupasighe who will be working on io...
ErlCesr09Apr2008
ERL@CESR Meeting April 9, 2008 * SLAC has hired a new project manager for LCLS in what appears to be a political move. John Gallayda (Accel. Physicist) was re...
ErlCesr09Aug2006
ERL@CESR Meeting August 9 * No minutes available Main.KarlSmolenski 10 Aug 2006
ErlCesr09Jan2008
ERL@CESR Meeting January 9, 2008 * Update on the miniworkshop on ERL@CESR layout. See Presentation * Option 0 Big return loop 150 w/m SR on beampip...
ErlCesr09Mar2005
ERL@CESR Meeting March 9, 2005 Notes: Ivan and Mattias reported on the status of the two control system working groups. Mattias' group meets in the conference ro...
ErlCesr10Aug2005
ERL@CESR Meeting August 10 * Charlie gave a presentation on the JLab experience with cavity trips. Overheads are attached. * Georg noted that Sol is in di...
r3 - 10 Aug 2005 - 16:14 by CharlesSinclair
ErlCesr10Jan2007
ERL@CESR Meeting January 10, 2007 * REU topics have been sent to Rich Galik and project advisers need to generate an abstract / advertisement for their project...
ErlCesr10Oct2006
ERL@CESR Meeting October 10 * * * * * Main.KarlSmolenski 06 Oct 2006
ErlCesr11Dec2008
ERL@CESR Meeting December 11, 2008 * General news: * NSF review report very positive. * The Wisconsin review pointed out technical difficulties ...
ErlCesr11Jan2006
ERL@CESR Meeting January 11 Today's meeting included two presentations: Mattias made a presentation about the open questions before a final list of parameters ca...
ErlCesr11Jun2008
ERL@CESR Meeting June 11, 2008 * News The cryo plant costing RFP went out. Private communications from the DOE/NSF light source panel have indicated that in...
ErlCesr11May2005
ERL@CESR Meeting May 11, 2005 Ivan reviewed (his talk can be found here) the use of higher order undulator harmonics that would allow us to run the ERL at lower b...
ErlCesr11Oct2006
ERL@CESR Meeting October 11 * Lattice update. Discussion ensued about two different file version management tools (CVS or Concurrent Versioning System vs. Sub...
ErlCesr11Sept2008
ERL@CESR Meeting September 11, 2008 * General news Joel's beamline design meeting is held mondays at 3pm. Sol pointed out that during his recent visit to Ja...
ErlCesr12Feb2009
ERL@CESR Meeting February 12, 2009 * General news: Please register for ERL 09 meeting if attending. New 1 turn ERL optics 7.3 has been released. * Update o...
ErlCesr12Jul2006
ERL@CESR Meeting July 12 * WBS structure: What details are needed to enable cost estimates. Thickness of shielding in current layout? 29 beamline locatation...
ErlCesr12Mar2009
ERL@CESR Meeting March 12, 2009 * General news: * CHESS / CESR continued operations proposal due next week for period Feb. 2010 2014. * BESAC wor...
ErlCesr12Oct2005
ERL@CESR Meeting October 10 * * Main.KarlSmolenski 10 Oct 2005
ErlCesr13Apr2005
ERL@CESR Meeting April 13, 2005 Sol just returned from a meeting in D.C. where he served on a panel of NSF advisors. Michael Turner (head of NSF MPS division) g...
ErlCesr13Aug2008
ERL@CESR Meeting August 13, 2008 * Don made a presentation on the vibration isolation requirements of x ray beamlines. * Don made a presentation on the late...
ErlCesr13Aug2009
ERL@CESR Meeting August 13, 2009 * Layout Planning Starting second cycle of work with engineering firm, need to work on the layout. Need to minimize undergr...
r2 - 25 Aug 2009 - 10:01 by kws
ErlCesr13Dec2006
ERL@CESR Meeting December 13 * Mike Forster gave an initial look at his calculations of the synchrotron radiation distribution around the ring for 100mA of cur...
r3 - 24 Jul 2007 - 13:07 by MikeForster
ErlCesr13July2005
ERL@CESR Meeting July 13 Some misc. notes: Main.KarlSmolenski 05 Jul 2005
ErlCesr13Nov2008
ERL@CESR Meeting November 13, 2008 * General news * NSLS II is undergoing CD3 review so that they can break ground, the federal continuing resolution ...
ErlCesr13Sept2006
ERL@CESR Meeting September 13 * Need to make a decision on fat pulse operation and how to provide for it. Currently there are three major options: 1. Pu...
ErlCesr14Mar2007
Minutes of the ERL@CESR Meeting 03/14/07 focused on ions in the ERL Participants mentioned in this writeup: Christian Spethmann (CS), Georg Hoffstaetter (GH), ...
ErlCesr14May2008
ERL@CESR Meeting May 14, 2008 * News We will have a visitor from Fermilab this summer to help with optics calculations. Kwan Je Kim will give a seminar next...
ErlCesr14May2009
ERL@CESR Meeting May 14, 2009 * Agenda File * General news: * PAC update (news from WiFEL, JLAB light sources, PEP x, next light source R D report to ...
ErlCesr14Sept2005
ERL@CESR Meeting September 14 * Richard Gillilan discussed the creation of an animated 3D virtual reality of the Phase II ERL as part of a public relations eff...
ErlCesr15Jan2009
ERL@CESR Meeting January 15, 2009 * Sergey took a tour of the BNL Gun / ERL facility. Working on an SRF high current gun. Their cryostat arrive and the RF sy...
ErlCesr15Mar2006
ERL@CESR Meeting March 15 Don showed a new version of the beamline layout based on a linac bent slightly to the north, allowing for more beamlines, and the length...
ErlCesr16Apr2008
ERL@CESR Meeting April 16, 2008 * There will be a workshop on ERL Diagnostic needs June 2, 3 here at Cornell. * A more serious look has been taken at the cr...
ErlCesr16Apr2009
ERL@CESR Meeting April 16, 2009 * Agenda File Contains the list of projects and people contributing to the 1 vs 2 turn decision. * General news: * N...
ErlCesr16Aug2006
ERL@CESR Meeting August 16 * General News: APS is considering an ERL based upgrade. Don recently visited and the main attraction is that the ERL could be bui...
ErlCesr16Jul2008
ERL@CESR Meeting July 16, 2008 * News: * John Scott (OSTP) visit went over well. Zakya Kafafi visit will have to be rescheduled, probably September. NY...
ErlCesr16July2009
ERL@CESR Meeting July 16, 2009 NOTE: Meeting Time is now 13:30 14:30 Thursdays * Agenda * General news: * Meeting with University architect, planners...
r2 - 24 Jul 2009 - 12:05 by kws
ErlCesr16Mar2005
ERL@CESR Meeting March 16, 2005 Georg reported that since many people will be away at the International ERL workshop at Jlab, there will be no meeting next week...
ErlCesr16Nov2005
ERL@CESR Meeting November 16 Announcements: KEK has decided to plan for an ERL light source instead of a super storage ring source. Their conclusion was the the...
ErlCesr16Oct2008
ERL@CESR Meeting October 16, 2008 * General news Some guests will be visiting soon: Kathy Harkay, Mike Furman. Florian Loehl from DESY will be here next wee...
ErlCesr17Aug2005
ERL@CESR Meeting August 17 * Georg summarized the results of the meeting with Michael Borland and Vadim Sajaev on light source upgrades vs. ERL upgrades. Writt...
ErlCesr17Jan2007
ERL@CESR Meeting January 17, 2007 * In the interest of answering the question of whether a folded or single linac is prefered, Ken Finkelstein made a presentat...
ErlCesr17May2006
ERL@CESR Meeting May 17 * Alexander Kazimirov made a presentation about the X Ray optics challenges for the ERL. The pdf file of this presentation is attache...
r2 - 19 May 2006 - 09:34 by AlexKazimirov
ErlCesr18Jun2008
ERL@CESR Meeting June 18, 2008 * News * Jens Knobloch visiting for much of the summer. Welcome. * There will be an NSF site visit to U. Wisco...
ErlCesr18June2009
ERL@CESR Meeting June 18, 2009 * Eric Chojnacki has been in touch with people in the material science department at UC Davis and will be exploring the use of c...
ErlCesr18Sept2008
ERL@CESR Meeting September 18, 2008 * General news * The NSF's Light source panel finished and submitted its report on Monday, but it is working its w...
ErlCesr19Feb2009
ERL@CESR Meeting February 19, 2009 * General news: ERL 09 registration stands at 32. Agenda items here. * Alexander made a presentation on the SC quad / di...
ErlCesr19Jul2006
ERL@CESR Meeting July 19 * There have only been minor changes to the lattice / layout drawings. The naming convention has been updated, and only slightly chan...
r2 - 09 Aug 2006 - 13:09 by MatthiasL
ErlCesr19Mar2009
ERL@CESR Meeting March 19, 2009 * Announcements: Please register for the ERL 09 workshop to be held June 8 12 at Cornell if you have not already done so. Reg...
ErlCesr1Mar2006
ERL@CESR Meeting March 1 * We need to meet soon to discuss the optimization (both technical and economic) of the cavity field strength (currently specified at ...
ErlCesr1Nov2006
ERL@CESR Meeting November 1 * Need to determine way to organize information about machine on web / computer. WBS structure is list of components, need way to ...
ErlCesr20Apr2005
ERL@CESR Meeting April 20, 2005 Ivan continued with the summary of the Working Group 1 focusing on Lasers. His presentation is attached to April 06 2005. Mattia...
ErlCesr20Aug2008
ERL@CESR Meeting August 20, 2008 Temp place holders.... * Don made a presentation on the vibration isolation requirements of x ray beamlines. * Don made a p...
ErlCesr20Aug2009
ERL@CESR Meeting August 20, 2009 * General News We received $5M in additional funding this week. LCLS has lased at 1.5Ang. The ICM is warming and being pre...
NEW - 25 Aug 2009 - 10:14 by kws
ErlCesr20Dec2006
ERL@CESR Meeting December 20 * The WBS is now on Wiki HERE. Discussion revolved around issues of evolving designs (things are not set in stone yet) and the bo...
ErlCesr20July2005
ERL@CESR Meeting July 20 Today's meeting involved setting the tone and agenda for next week's two day meeting with Michael Borland and Vadim Sajaev from APS. Bor...
ErlCesr20Sept2006
ERL@CESR Meeting September 20 * Lattice development, still working on undulator layout. Incoherent SR under control. Need to edit parameter tables. 60% grow...
ErlCesr21Dec2005
ERL@CESR Meeting December 21 * Maury and Charlie addressed the issue of how to organize the WBS structure for the full machine proposal. There were two compet...
ErlCesr21May2008
ERL@CESR Meeting May 7, 2008 * News There will be a mini workshop on June 7th to discuss how to ramp up to 100mA. * Joel Brock, David Sagan and Georg Hoff...
ErlCesr21May2009
ERL@CESR Meeting May 21, 2009 * Summary Agenda File * Matthias made a presentation on cavity error / perturbations studies. Main.KarlSmolenski 18 Jun 20...
ErlCesr22Jan2009
ERL@CESR Meeting January 22, 2009 * Text of bailout bill looks promising for NSF and science. * Ion detector working but has some RF noise. * Injector te...
ErlCesr22Nov2006
ERL@CESR Meeting November 22 * Georg gave an overview of the recent APS upgrade review. APS is having difficulty coming to convergence on many issues. They a...
ErlCesr23Apr2008
ERL@CESR Meeting April 23, 2008 * General News The KEK roadmap report was submitted to Japanese funding agencies. KEK will be a world leading in photon sci...
ErlCesr23Apr2009
ERL@CESR Meeting April 23, 2009 * General news: * Chris passed his PhD defense Congratulations * NSF review panel will be here next week Monday t...
ErlCesr23Aug2006
ERL@CESR Meeting August 23 * Gov. Pataki was in Ithaca to present funding for the interim period / engineering studies in preparation for Phase II. Pataki was...
ErlCesr23Jan2008
ERL@CESR Meeting January 23, 2008 * Maury visited the XFEL and looking into their plans for e beam stabilization. PSI is working on it and Flash will test th...
ErlCesr23Jul2008
ERL@CESR Meeting July 23, 2008 * News: * Update on cryomodule HOM loads 2mm pipe plugged, warmed to 80K, oxygen monitor showing huge spikes (1ppm to se...
ErlCesr23July2009
ERL@CESR Meeting July 23, 2009 * General news: * Second eLHC workshop with ERL option in September * Front to end update: Impact and Ji Qiang ...
r2 - 30 Jul 2009 - 16:16 by kws
ErlCesr23Oct2008
ERL@CESR Meeting October 23, 2008 * General news Florian Loehl, visiting from DESY, will give a seminar tomorrow. Mike Harrison Visits next week. The Accel...
ErlCesr25Jan2006
ERL@CESR Meeting January 25 Today's meeting included three presentations on the design of undulators for the ERL: Shasha started with a talk on the design of a ...
ErlCesr25Jun2008
ERL@CESR Meeting June 25, 2008 * Georg and Karl were away so no notes are available. The following presentations were given: * Dave Rice gave a presenta...
ErlCesr25June2009
ERL@CESR Meeting June 25, 2009 * Comments on workshop. Peter McIntosh (Daresbury) presented a slide showing predicted cryogenic loads, that disagreed with wha...
ErlCesr25May2005
ERL@CESR Meeting May 25, 2005 PAC summary, lots of people (1400), too much information to summarize (!) Today's meeting centered on the issue of a proposal for t...
ErlCesr25Sept2008
ERL@CESR Meeting September 25, 2008 * General news * People are here from Accel reporting on their study of the beamline components. They have complete...
ErlCesr26Apr2006
ERL@CESR Meeting April 26 * Peter Revez lead a presentation on beam position monitors for x ray beamlines. His presentation is attached click here. Sol and A...
ErlCesr26Feb2009
ERL@CESR Meeting February 26, 2009 * General news: Jim Crittenden will give the PAC ERL overview talk, SRF article in ILC news, ion detector back installed fo...
ErlCesr26Mar2009
ERL@CESR Meeting March 26, 2009 * General news: BESSY is considering a 2 turn energy recovering loop in their prototype. Sol attended the APS march meeting, ...
ErlCesr27Aug2008
ERL@CESR Meeting August 27, 2008 * News: The NSF panel (on funding of future light sources) will submit their report tomorrow. Stanford / LBL have issued a w...
ErlCesr27July2005
ERL@CESR Meeting July 27 Three topics were discussed at today's meeting: * Ivan discussed the next round of merger simulations using Parmela on the CTC (Cornel...
ErlCesr27May2009
ERL@CESR Meeting May 28, 2009 * Maury was at JLab for a HEPAP meeting. NSF is tripling grad fellowships, may be a benefit to us to support more students. DOE...
ErlCesr27Sept2006
ERL@CESR Meeting September 27 * Friday Michael Borland will be making a presentation on Possible APS Upgrades at noon. * Lattice update: Details of files, ...
ErlCesr28Jun2006
ERL@CESR Meeting June 28 * Report from the CHESS workshops. Lots of ideas, many new ideas that hadn't been foreseen. Our current list of beamlines is being t...
ErlCesr28May2008
ERL@CESR Meeting May 28, 2008 * News BESSY is considering an ERL upgrade path. APS annual report mentions an XFEL upgrade path, (Kwan Je Kim will be giving ...
ErlCesr28Sept2005
ERL@CESR Meeting September 28 * Dave Sagan discussed the implementation of CSR into the BMAD code. The crux of the matter is the validity of the approximatati...
ErlCesr29Jan2009
ERL@CESR Meeting January 29, 2009 * Georg has moved to a single file with most of the information and images presented during the meeting. It is attached as a...
ErlCesr29Mar2006
ERL@CESR Meeting March 29 * A new version of the beamline layout drawings were shown (clockwise rotation). Next Dana will work on the CCW version. Don is hap...
ErlCesr29Nov2006
ERL@CESR Meeting November 29 * Jerry led a discussion on the WBS structure for the full ERL. There are 11 top level items and we started by going through a re...
ErlCesr2Jul2008
ERL@CESR Meeting July 2, 2008 placeholder * News * Welcome. * There will be Main.KarlSmolenski 23 Jun 2008
ErlCesr2July2009
ERL@CESR Meeting July 2, 2009 * General news: * LCLS has a director * SSRL director mentioned ERL as and option for PEP X * Update on layout ...
ErlCesr2Oct2008
ERL@CESR Meeting October 2, 2008 1) General news ACCEL visits Cornell at Oct 2 and 3. They are presenting their draft report, mostly focusing on girders and vac...
ErlCesr30Apr2008
ERL@CESR Meeting April 30, 2008 * SLAC is working on a PEP X proposal for conversion of PEP into an X ray light source with parameters near ERL levels. The re...
ErlCesr30Apr2009
ERL@CESR Meeting April 30, 2009 * General News 135 registered for ERL 09 Workshop. NSF review went very well, with the ERL a strong (silent) component. Mau...
ErlCesr30Aug2006
ERL@CESR Meeting August 30 * APS now has an upgrade plan website and about 90% of the talks from their recent workshop are now online. * Chris discussed ...
ErlCesr30Jan2008
ERL@CESR Meeting January 30, 2008 * News: NSF light source operation committee will visit CESR / CHESS on March 25/26 and will then travel to Univ. Wisc. on th...
ErlCesr30Jul2008
ERL@CESR Meeting July 30, 2008 * News: * Bessy is proposing a prototype ERL, with a CW linac based on the Daresbury cryomodule, with an energy recovery...
ErlCesr30July2009
ERL@CESR Meeting July 30, 2009 * General news: * Impact T telephone meeting * Peter Quigley and Sergey Belomestnykh at Daresbury Coupler test, cavi...
NEW - 30 Jul 2009 - 16:37 by kws
ErlCesr30Mar2005
ERL@CESR Meeting March 30, 2005 Georg and Mattias summarized the ERL workshop at JLab, reporting on working groups 2 and 3, see attached presentations. The next ...
ErlCesr30Nov2005
ERL@CESR Meeting November 30 The meeting revolved around assigning editors and authors to the various sections of the ERL final proposal. Georg went over the tab...
ErlCesr30Oct2008
ERL@CESR Meeting October 30, 2008 * General news Progress on planning for the ERL 09 meeting in June. This will be the 45th ICFA workshop on beam dynamics, ...
ErlCesr31Aug2005
ERL@CESR Meeting August 31 Note the new time for ERL@CESR meetings is 3:00 wednesdays * Charlie attended the recent FEL meeting and reported there were two hot...
ErlCesr3Jan2007
ERL@CESR Meeting January 3, 2007 * Rich Galik needs ideas (a short paragraph) for projects for Summer REU students. Georg is collecting a list of ERL ideas, p...
ErlCesr3Sept2008
ERL@CESR Meeting September 4, 2008 * General news: The future of light source funding report should have been submitted to DOE/NSF. SLAC / LBL are including ...
ErlCesr4Dec2008
ERL@CESR Meeting December 4, 2008 * General news: * REU09 update give project abstracts to Georg. * NSF update reverse site visit went well ...
ErlCesr4Jan2006
ERL@CESR Meeting January 4 Today's meeting included two presentations: Charlie presented his views on the WBS structure, which were well received. Georg wants t...
ErlCesr4Jun2008
ERL@CESR Meeting June 4, 2008 * News The instrumentation meeting was fruitful, some of the presentations contain unpublished results and should be treated as...
ErlCesr4June2009
ERL@CESR Meeting June 4th, 2009 * General news: * ERL workshop update #8211; world record participants, tours, posters, sponsors, schedules are in the e...
ErlCesr4Oct2006
ERL@CESR Meeting October 4 * Michael Borland made a presentation last week discussing APS upgrade activities (Cornell 5 years someone joked) and showed sketch...
ErlCesr5Apr2006
ERL@CESR Meeting April 5 * Latest version of the layout drawings are being cleaned up by the drafting shop for use bby Maury and PDC. Drawings are here. * M...
ErlCesr5Feb2009
ERL@CESR Meeting February 5, 2009 * General news: Daresbury achieved energy recovery, info in CERN Courier. LBNL has internal funding for their normal conduct...
ErlCesr5Mar2009
ERL@CESR Meeting March 5, 2009 * General news: CHESS policy board meeting today, strong support for ERL. REU acceptances are out, 10 total students this summ...
ErlCesr6Aug2008
ERL@CESR Meeting August 6, 2008 * Jim made a presentation on the layout / turnaround optics. There are now dual turn around arcs, the north linac has 36 cryom...
ErlCesr6Aug2009
ERL@CESR Meeting August 6, 2009 * General news: * Don and Joel are at the Gordon X ray conference. They are talking with authors of an upcoming x ray sc...
r5 - 19 Aug 2009 - 11:44 by kws
ErlCesr6Dec2006
ERL@CESR Meeting December 6 * Jerry led a discussion on the WBS structure for the full ERL. Please see the attached Word Document below outlining the WBS. So...
ErlCesr6Nov2008
ERL@CESR Meeting November 6, 2008 * General news NSF light source report is out and is generally very good including recommendations for NSF to continue ligh...
ErlCesr6Sept2006
ERL@CESR Meeting September 6 * Jerry Codner updated us on the WBS / Budget project. In response to a question from Maury Tigner, "does this include everythi...
ErlCesr7Dec2005
ERL@CESR Meeting December 7 Most of the meeting was spent reviewing the ERL parameter list and how it is set up in the WIKI pages. Arthurs of each section of the...
ErlCesr7Feb2007
ERL@CESR Meeting February 7, 2007 * Dave Rice has set up a new WIKI front page, check it out and send him your comments. * Shlomo gave an updated presentati...
r2 - 08 Feb 2007 - 14:52 by DhR
ErlCesr7Jun2006
ERL@CESR Meeting June 7 * Georg will be away next week, so no meeting is planned * Update on parameter list. Because of the 6 CHESS workshops we're working...
ErlCesr8Jan2009
ERL@CESR Meeting January 8, 2009 * Update on Injector Coupler processing (Cavity 1: about 40 summed over both couplers, Cavity 2 5 approximately 40kW summed ov...
ErlCesr8Mar2006
ERL@CESR Meeting March 8 The meeting discussed the specification for cavity gradient. Maury suggested that if it is difficult to pin down a number at least we sh...
r3 - 08 Mar 2006 - 16:47 by MatthiasL
ErlCesr8Nov2006
ERL@CESR Meeting November 8 * Visitors from KEK and Tokyo Univ. here to discuss the optimization of main linac RF cavities. They are part of the revival of th...
ErlCesr9Jul2008
ERL@CESR Meeting July 9, 2008 * News: * First beam thru the cryomodule on Monday 7/7, with one cavity energized to test phasing on Tuesday 7/8, and all 5...
ErlCesr9July2009
ERL@CESR Meeting July 9, 2009 * General news: * CAC supports cavity optimization needs * Phase 1b work * Update on Injector * Pincushion d...
ErlCesr9Mar2009
ERL@CESR Meeting April 9, 2009 * General news: Phase 1b 1 year proposal is out. Welcome Florian Loehl to the ERL group. * Injector Update still searchi...
ErlCesr9Oct2008
ERL@CESR Meeting October 9, 2008 * General news * Darren Dale reported on the high brilliance beamline. Main.KarlSmolenski 14 Oct 2008
ErlCesrMeetings
ERL @ CESR Meeting Minutes ERL @ CESR Meeting Minutes 2012 (Meeting held: Thursdays 3:00 4:00 PM CHESS Conference Room) Name abbreviations for the usual susp...
ErlGeneral06July2005
ERL General Meeting July 06, 2005 Mattias and Hasan gave updates on the status of the ERL cryomodule. Presentions are attached below. Main.KarlSmolenski 19 J...
ErlGeneral07Sep2005
ERL General Meeting Sept. 07, 2005 Submitted by B.J. Bortz, 9/12/05 This is the first ERL general meeting utilizing the new format of brief reports from the acti...
ErlGeneral10Jan2007
ERL General Meeting January 10, 2007 *Other News * Meeting held at Univ. Maryland to discussion space charge issues in gun / injector, possible beginnings of a c...
ErlGeneral11Jan2006
ERL General Meeting Jan. 11, 2006 Electron Gun C. Sinclair We have completed a trial assembly of the electrode structure and for the most part things went toge...
ErlGeneral11Oct2006
ERL General Meeting October 11, 2006 Other News Electron gun W128 operation C. Sinclair Update on second ceramic, close but no cigar. The resistivity of th...
r3 - 23 Oct 2006 - 10:07 by RongliGeng
ErlGeneral12Apr2006
ERL General Meeting April 12, 2006 Electron Gun C. Sinclair Leak in ceramic top joint. Disassembly for repair will happen today. Progress on the high voltage...
ErlGeneral12July2006
ERL General Meeting July 12, 2006 Other News * Autocad training Thursday 13th through Monday July 17th. * Revisions to Wiki Structure Dave Rice Electro...
ErlGeneral13Dec2006
ERL General Meeting December 13, 2006 Other News Electron gun W128 operation C. Sinclair Tore open entire gun for SS to Ti electrode switch over. May be be...
ErlGeneral13Sept2006
ERL General Meeting September 13, 2006 Other News Welcome to Bruce Dunham. Electron gun W128 operation C. Sinclair We've added some lead shielding to the gu...
ErlGeneral14Dec2005
ERL General Meeting Dec. 14, 2005 Summer REU Program R. Galik Rich Galik gave an overview of the summer Research Experience for Undergraduates program (REU) an...
ErlGeneral14June2006
ERL General Meeting June 7, 2006 Other News Electron gun W128 operation C. Sinclair Lasers D. Ouzounov Two cell cavities R.L. Geng Cryomodule, tuner...
ErlGeneral15Feb2006
ERL General Meeting Feb. 15, 2006 Electron Gun C. Sinclair Preparing to assembly the gun electrode structure. Had to repolish some of the parts due to minor s...
ErlGeneral15Mar2006
ERL General Meeting March 15, 2006 Electron Gun C. Sinclair The gun is together and we're working this week on small issues. The progress has been slow with t...
ErlGeneral15Nov2006
ERL General Meeting November 15, 2006 Other News Meeting time may be shifted, CKS requests people's opinions in an email. Electron gun W128 operation C. Sin...
r3 - 17 Nov 2006 - 08:54 by CharlesSinclair
ErlGeneral16Aug2006
ERL General Meeting August 9, 2006 Other News Electron gun W128 operation C. Sinclair Reached 244KV conditioning limit, concluded that we'll need to use a c...
ErlGeneral16Mar2005
ERL General Meeting Notes March 16, 2005, 2 3 PM, Wilson Commons Area Project Accounting Issues Information We now have three large active projects (Coop...
ErlGeneral16Nov2005
ERL General Meeting Nov. 16, 2005 Electron Gun C. Sinclair The gun ceramic drew more current than the power supply can provide at 40KV, and caused a tremendous...
ErlGeneral17Jan2007
ERL General Meeting January 17, 2007 *Other News * Electron gun W128 operation B. Dunham Working on HV processing of Ti electrodes. Not going well. Starte...
ErlGeneral17May2006
ERL General Meeting May 17, 2006 Electron gun W128 operation C. Sinclair HVPS is done and will be brought to Cornell. Design review for 750KV supply will be...
ErlGeneral18Jan2006
ERL General Meeting Jan. 18, 2006 Electron Gun C. Sinclair The first of two 100 hour, 400C bakes in air is taking place right now, to fire components that go i...
ErlGeneral18Oct2006
ERL General Meeting October 18, 2006 Other News Electron gun W128 operation C. Sinclair Running gun on / off and making steady / slow progress. Measured th...
r2 - 19 Oct 2006 - 08:56 by CharlesSinclair
ErlGeneral19Apr2006
ERL General Meeting April 19, 2006 Electron Gun C. Sinclair Spend last two weeks disassembling and rebuilding gun to repair ceramic leak. The ceramic appears ...
r3 - 23 Apr 2006 - 21:05 by CharlesSinclair
ErlGeneral19July2006
ERL General Meeting July 19, 2006 Other News * Inventor 11 and Vault training complete and running throughout lab. Allows for version control of CAD documen...
ErlGeneral19Oct2005
ERL General Meeting Oct. 19, 2005 ERL Layout D. Bilderback Don brought up the need for layout drawings of the currently planned ERL lattice, with insertion de...
ErlGeneral1Feb2006
ERL General Meeting Feb. 1, 2006 Today's meeting did not follow the standard format of past meetings Milestone Schedule Update R. Gallagher Richard showed his ...
ErlGeneral1Mar2006
ERL General Meeting March 1, 2006 Electron Gun C. Sinclair The gun and its related cathode preparation chambers are assembled and together. Alignment of the e...
ErlGeneral1Nov2006
ERL General Meeting November 1, 2006 Other News Electron gun W128 operation C. Sinclair Trying second of two types of cathodes. Ga As P close to ready to r...
r3 - 04 Nov 2006 - 14:01 by CharlesSinclair
ErlGeneral20Dec2006
ERL General Meeting December 20, 2006 Other News Phase 1 Facilities Update Richard Gallagher Richard's Presentation. Cites CIT and PDC headaches and delays....
ErlGeneral20July2005
ERL General Meeting July 20, 2005 Text Here Main.KarlSmolenski 19 Jul 2005
ErlGeneral20Sept2006
ERL General Meeting September 20, 2006 Other News Electron gun W128 operation C. Sinclair 5 uA recorded at the dump. Dump, Faraday Cup readouts working fin...
ErlGeneral21Dec2005
ERL General Meeting Dec. 21, 2005 Electron Gun C. Sinclair The gun ceramic has been reworked by the vendor and they have measured a reasonable resistance, it i...
ErlGeneral22Mar2006
ERL General Meeting March 22, 2006 Electron Gun C. Sinclair Almost done. Gun and components are all together and much of the punch list items are complete. S...
ErlGeneral22Nov2006
ERL General Meeting November 22, 2006 Other News Meeting will be held at 2pm starting on Jan 17th. A visitor from KEK will be joining us for 6 12 months, workin...
ErlGeneral23Aug2006
ERL General Meeting August 9, 2006 Other News Daresbury 4GLS project achieved first beam from their photoemission gun. This gun is based on the JLab gun with no...
ErlGeneral23Nov2005
ERL General Meeting Nov. 23, 2005 Electron Gun C. Sinclair Ceramic still not fully understood, but the voltage dependant resistance is too low (300 MOhm at low...
ErlGeneral24Jan2007
ERL General Meeting January 24, 2007 Minutes Coming Soon. *Other News * Electron gun W128 operation B. Dunham Lasers D. Ouzounov Two cell cavities R.L...
ErlGeneral24May2006
ERL General Meeting May 24, 2006 Electron gun W128 operation C. Sinclair Ramping up field emission testing with the addition of a student for the summer. A ...
ErlGeneral25Jan2006
ERL General Meeting Jan. 25, 2006 Electron Gun C. Sinclair Charlie gave a slide show of progress on the assembly of the gun. The high voltage power supply is ...
ErlGeneral25Oct2006
ERL General Meeting October 25, 2006 Other News Electron gun W128 operation C. Sinclair Ready to try GaAsP photocathode. Processed to 300KV, where there is...
ErlGeneral26Apr2006
ERL General Meeting April 26, 2006 Electron Gun C. Sinclair All gun leaks fixed and we're currently baking the gun system, it has been a struggle with huge int...
ErlGeneral26July2006
ERL General Meeting July 19, 2006 Other News * Autocad training Thursday 13th through Monday July 17th. Electron gun W128 operation C. Sinclair Lasers ...
ErlGeneral27Apr2005
ERL General Meeting April 27, 2005 Sol presented a series of X ray science workshops to be held over the next year, in order to prepare, 18 months from now, the s...
ErlGeneral27Sept2006
ERL General Meeting September 27, 2006 Other News Charlie will be retiring at the end of the year congratulations. CKS away next week, Maury to run the meetin...
ErlGeneral28June2006
ERL General Meeting June 28, 2006 Other News Autocad Vault training on monday July 17th. Electron gun W128 operation C. Sinclair New leaks! Current thinkin...
ErlGeneral29Mar2006
ERL General Meeting March 29, 2006 Electron Gun C. Sinclair 125KV test done on the gun with no field emmission. We're playing with moving the cathode puck int...
ErlGeneral29Nov2006
ERL General Meeting November 29, 2006 Other News Electron gun W128 operation C. Sinclair New field emission sample from Epion field emits like crazy, disast...
ErlGeneral2Aug2006
ERL General Meeting August 2, 2006 Other News Bruce Dunham has accepted a job offered to him. He will start in early September which is great news to add anothe...
ErlGeneral30Aug2006
ERL General Meeting August 30, 2006 Other News Electron gun W128 operation C. Sinclair Series resistor added between HV power supply and gun. Now we are ab...
ErlGeneral30Nov2005
ERL General Meeting Nov. 30, 2005 Electron Gun C. Sinclair Field Emission test setup is ready for further tests. The ceramic has been shipped back to CPI for ...
ErlGeneral31Jan2007
ERL General Meeting January 31, 2007 Minutes Coming Soon. Main.KarlSmolenski 06 Feb 2007
ErlGeneral31May2006
ERL General Meeting May 31, 2006 Other News Dave Rice has taken responsibility for L0 installation. Electron gun W128 operation C. Sinclair 300 kV HV PS has...
r3 - 01 Jun 2006 - 12:26 by SergeyBelomestnykh
ErlGeneral3Jan2007
ERL General Meeting January 3, 2007 Other News Electron gun W128 operation C. Sinclair Kaiser 750KV power supply arrived and was assembled during break, it ...
ErlGeneral3May2006
ERL General Meeting May 3, 2006 Other News The schedule for meetings is changing starting next week: * ERL General meeting (weekly) 1 2pm * ERL@CESR (now w...
r2 - 08 May 2006 - 14:49 by MatthiasL
ErlGeneral4Jan2006
ERL General Meeting Jan. 4, 2006 Electron Gun C. Sinclair The ceramic is here and tested, and while the resistance is higher than specified, this will be corre...
ErlGeneral4Oct2006
ERL General Meeting October 4, 2006 Other News Electron gun W128 operation C. Sinclair Last week had problems with the translator arms moving puck into the ...
ErlGeneral5Apr2006
ERL General Meeting April 5, 2006 Electron Gun C. Sinclair Latest cathode acheived QE of greater than 15%, a record for us. Gun ceramic appears to have a smal...
ErlGeneral5July2006
ERL General Meeting July 5, 2006 Other News Autocad Vault training on monday July 17th. Electron gun W128 operation C. Sinclair Took everything apart and tr...
ErlGeneral6Dec2006
ERL General Meeting December 6, 2006 Other News Eric Chojnacki has rejoined the lab in the SRF group. Welcome. Electron gun W128 operation C. Sinclair Dete...
ErlGeneral6Sept2006
ERL General Meeting September 6, 2006 Other News Charlie, Yulin will be away next two weeks Maury or Karl will handle next two meetings. Electron gun W128 o...
ErlGeneral7Dec2005
ERL General Meeting Dec. 7, 2005 Electron Gun C. Sinclair Missing parts holding up action on the chamber assembly front. Domes and corona rings for the cerami...
ErlGeneral7Feb2007
ERL General Meeting February 7, 2007 Other News Gun/Room 128/Lasers Bruce SRF (2 cell, test cryostat, HOM, horizontal test, tuners) Hasan / Eric RF (Klyst...
ErlGeneral7June2006
ERL General Meeting June 7, 2006 Other News Many people are having issues with logging into the Wiki, an email will be sent out explaining the new login proceedu...
r2 - 08 Jun 2006 - 12:44 by CharlesSinclair
ErlGeneral8Feb2006
ERL General Meeting Feb. 8, 2006 Electron Gun C. Sinclair Electrode structure is all polished and ready to go, 400C air bake complete. The NEG arrays need ass...
ErlGeneral8Nov2006
ERL General Meeting November 8, 2006 Other News Electron gun W128 operation C. Sinclair The ceramic vendor (CPI) is still working on the second ceramic, slo...
ErlGeneral9Aug2006
ERL General Meeting August 9, 2006 Other News Thank you to Vanya Temnykh for taking these notes. Electron gun W128 operation C. Sinclair Changes to the Gun ...
ErlGeneral9Nov2005
ERL General Meeting Nov. 9, 2005 Electron Gun C. Sinclair The gun ceramic has arrived and has been installed. The initial power supply for the gun has been te...
ErlGeneralMeetings
ERL General Meeting Minutes 2009 Meeting held every Thursday at 2pm in the CHESS conference room. January 2009 * Jan 21 2009: Meeting Notes January 21 Februa...
L0PreRadSafety
L0 Area Pre Construction Radiation Safety Documentation This is Blah Blah Blah, very safe Mike Ray. Main.KarlSmolenski 04 Dec 2006
MinutesGun10Oct2005
Gun Meeting 10 October 2005 Gun chamber update See Karl's attachement. Some highlights: * 150C bakeout repeated for better SRG outgassing measurements, this t...
MinutesGun11Jul2005
Gun Meeting 11 July 2005 Meeting Notes Gun update (Karl) See his attach. Some additional highlights: * He showed the puck retainer that will be used. * 31...
MinutesGun124Apr2006
Please correct factual errors and upload your attachements Gun Meeting 24 April 2006 No formal report from this meeting. This meeting will no longer be held. ...
MinutesGun17Apr2006
Please correct factual errors and upload your attachements Gun Meeting 17 April 2006 Gun Update Charlie reports: * Need to finish Gun survey so we can close ...
MinutesGun17Oct2005
Gun Meeting 17 October 2005 Gun chamber update Air bake out in progress at 400C and will finish Wednesday afternoon. Pump also being fired and can be reassemble...
MinutesGun20June2005
Gun Meeting 20 June 2005 Xianghong Liu presented outgassing data, attached. Main.KarlSmolenski 5 July 2005
MinutesGun23May2005
Gun Meeting 23 May 2005 Karl presented updates on the status of the Gun assembly and the Preparation assembly, attached below. There are two major issues at the ...
SafetyCathode
Cathode Preparation Safety Matrix Cathode Prep Pre construction Construction / Assy Testing Operations Repair Radiation Yes N/A X X X ...
SafetyL0
L0 Area Matrix L0 Area Pre construction Construction / Assy Testing Operations Repair Radiation Yes N/A X X X Electrical X X X ...
TestComments
.CommentPlugin Test How well does this comment box work? Main.DevinBougie 09 Mar 2005 looks good to me... Main.IvanBazarov 10 Mar 2005 yes this seems to W...
WebStatistics
Statistics for ERL/Private Web Month: Topic views: Topic saves: File uploads: Most popular topic views: Top contributors for topic save and uploa...
XbeamlineParameters
Parameter Value Unit Reference * ERLCESR_083006.doc: Current List of Beamline Specifications and Insertion Devices Back to: P...
Number of topics: 217
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding CLASSE Wiki? Send feedback