Report for Bulk Register Registering StephenGray You are already registered You cannot register twice, the name 'swg' is already registered. Did you want to res...
* revisited conflict in R128 between corrector coils and deflecting cavity. it was decided that for the timing measurements we will remove EMS coils and shift the...
* L0 solenoid will have BPM feedthroughs' cable going through the steel yoke. The impact of the holes is being evaluated, but believed to be small. * The solen...
* W 128 slit update: we have a structure design for the slit. The shop manifactures OFHC copper precision slit piece, to be polished in Clark Hall. If OFHC proves...
* Xianghong: slit thermo mechanical analysis for R128 is done. * 1.3 kW beam on the slit is OK. Max heat flux in the water pipe ~ 40 W/cm^2. When beam is of...
ERL@CESR Meeting December 13 * Mike Forster gave an initial look at his calculations of the synchrotron radiation distribution around the ring for 100mA of cur...
ERL@CESR Meeting January 17, 2007 * In the interest of answering the question of whether a folded or single linac is prefered, Ken Finkelstein made a presentat...
Ferrite Filter for Beam Dump Electrodes Tested ferrites, which are used on the CESR Control System for EMI filtering, for use with the electrodes. These would be...
Laser Entrance Box with Adjustable Stainless Steel Mirrors Yulin Li, Last Update 2/1/2008 * The design of the laser entrance assembly is detailed in LEPP Draw...
Calulated Pressure Profiles in L0 Beamline, A3 to A5 Sections Calculation Inputs * Calulation using the one dimensional finite element program, with 1 cm lo...
This is a subscription service to be automatically notified by e mail when topics change in this ERL/Private web. This is a convenient service, so you do not have...
CESR TA Vacuum Meeting (April 3, 2008) Attendees: YL, DHR, DLR, MAP, TOC, XL, Kaminski, MGB, VM * Yulin showed status of the B12W RFA chamber design. The draw...
CesrTA Collaboration Meetings * Collaboration WebEx meetings will generally (but not always) occur on the 2nd or 3rd Tuesday of each month. * Next Meeting: T...
CesrTA Engineering Design Information Wiggler Vacuum Chamber with Electron Cloud Diagnostics and Mitigation * CU LEPP Drawing 6085 003 * Released Drawing...
* Yulin showed progress on B12W Thin RFA dipole RFA chamber progress * TMK will finish B12W dipole chamber model design, w/o RFA port yet, by this Friday ...
* Yulin showed progress on B12W Thin RFA dipole RFA chamber progress * TMK will finish B12W dipole chamber model design, w/o RFA port yet, by this Friday ...