CBPM2 Troubleshooting Summary -- 10W -- Initial symptoms of interrupting timing scan As far back as 2/28, but basically unavailable since 4/12 5/9/23 - changed timing tap, added toroids, ferrite, more grounding - when timing in, get "_final() function failed" 5/16/23 - During access, returned all 0's, followed by a handshake timeout during phase measurement - Followed up with Matlab Pulse test, noise test, SRAM test, EEPROM test, all reasonable - During shift, some intial problems -> reflash, seems working but returned button sum = 0 -- X5C -- Initial symptoms of rebooting during phase measurement Reported 4/17, 4/18 5/9/2023 - when time scanning, get "_final() function failed", persists after reboot 5/16/2023 - during access, normal operation, including phase measurement (as much as possible with no beam) - Followed up with Matlab pulse test, noise test, SRAM test, EEPROM test, all reasonable - During shift, hung up time scan, removed it and completed -- 25E -- New one. Reflashed to get temps, successfully time scanned, very large noise? -- X6C -- Also new this week. "Bad socket fd" errors, persisted through power cycle. I was working in the area for swapping badges, maybe jostled something? Check next week.