Welcome to the project information repository for the NSF MREFC 2021 Annual Progress Review.
Charge to the NSF Review Panel [Doc DB - 14259]
Agenda [Access key sent separately via email to committee members]
Access to documents requires a CERN lightweight account. Information about how to obtain a CERN lightweight account was distributed to reviewers by email, along with a file containing copies of all the documents linked below. If you need any assistance, please contact Brenda Smith at bkc4@cornell.edu
This Document Guide provides a brief overview of the documents and the charge questions they address (added 2021-8-18)
to ensure that you get the most updated material. We may have recently uploaded new documents.
Topic 1: Project Plans
- Abbreviations and Acronyms [Doc DB - 13454]
- NSF Project Execution Plan [Doc DB - 13279]
- Key Assumptions [Doc DB - 12919]
- Cost Estimating Plan [Doc DB - 13256]
- Quality Assurance Plan [Doc DB - 13093]
- Systems Engineering Management Plan [Doc DB - 13194]
- Project Organization Charts [Doc DB - 13174]
- Cooperative Agreement for the HL-LHC MREFC [Doc DB - 14311]
- Configuration Management and Change Control Plan [Doc DB - 12907]
- MREFC SOWs for FY2020 [Doc DB - 14305]
- MREFC SOWs for FY2021 [Doc DB - 14306]
- NSF Covid-19 Rebaselining Guidance [Doc DB - 14136]
Topic 2: Scope
- Summary of Scoping Options (NSF scope) [Doc DB - 13357]
- Work Breakdown Structures [Doc DB - 13165]
Topic 3: Technical
- Science Goals and Requirements [Doc DB - 13337]
- 402.3 Barrel Calorimeter -- Requirements and Interfaces [Doc DB - 13317]
- 402.5 Endcap Muons -- Requirements and Interfaces [Doc DB - 13281]
- 402.7 Forward Pixels -- Requirements and Interfaces [Doc DB - 13304]
- 402.6 Trigger and DAQ -- Requirements and Interfaces [Doc DB - 13318]
Topic 4: Cost
Topic 5: Schedule
- Project Schedule -- Summary Views [Doc DB - 13399]
- P6 Schedule (Gantt) [Doc DB - 13245]
Topic 6: Risk
- Risk Register (NSF scope) [Doc DB - 12897]
- Risk Management Plan (MREFC scope) [Doc DB - 13408]
- Covid-19 Impact Modeling Proceedure [Doc DB - 14308]
Topic 7: Change Control and Reporting
- Monthly Reports (NSF scope) [Doc DB - Topic - 775]
- Baseline Change Control Log [Doc DB - 13881]
- NSF MREFC Baseline Change Requests [Doc DB - Topic - 857]
Topic B: Standard Procedures and Guidance
- Fermilab Office of Project Support Services documents [Doc DB - 14307] - including the following documents:
- Fermilab Office of Project Support Services documents
- Fermilab Project Procedures #1: WBS, OBS, RAM
- Fermilab Project Procedures #2: Control Accounts, Work Packages, Planning Packages
- Fermilab Project Procedures #3: Work Authorization
- Fermilab Project Procedures #4: Project Scheduling
- Fermilab Project Procedures #5: Cost Estimating
- Fermilab Project Procedures #6: Monthly Status Reporting
- Fermilab Project Procedures #7: Change Control
- Fermilab Project Procedures #8: EVMS Surveillance and Maintenance
- Fermilab Earned Value Management System certification letter
- Fermilab Risk Management Procedures for Projects
Topic C: Previous Reviews
- CMS Response to FDR Recommendations [DB - 14309]