Meeting 29 April 2005 2pm
Minutes
Attendees: Codner, Li, Love, Palmer, Strohman, Schwarthoff, Watkins, Wilksen
Beam Size Monitor is installed
Mark gave a brief overview about the installation and first data taking with
with the new beam size monitor. A log book of the on going work can be found
here.
Project Overview and Task Assignment
Mark showed slides on how to distribute various coding and organizational tasks. The current list
can be found in the
group member wiki page.
A pdf file of the slides is also available
Miscellaneous
Mark will meet with coordinators in the upcoming week to go over basics regarding the
various sub tasks and how to use the existing code infrastructure.
Also it was pointed out that we need a few tutorials e.g. for
dealing with the CESR control system or how to use CVS and set up the correct environment
for compiling and submitting code to CVS.
--
TimWilksen - 29 Apr 2005