Tags
-- Main.rlh - 08 Mar 2008

March 2008

  • Results: 45 bunch train e-/e+ CESR-c beam dynamics-3/1/2008

April 2008

  • Results: e- beam dynamics for 45 bunch train

October 2008

  • Results: e- cloud machine studies-systematic study of single bunch tunes 10/29/2008-ppt file
  • Results: e- cloud machine studies-systematic study of single bunch tunes 10/29/2008-pdf file
Quick Time Movies for 10/29/2008 results:
  • movie: Movie of the vertical spectrum for bunches 1-10 at the six vertical pinger settings (sequence 204, 100, 46, 30, 20, 73cu).
  • movie: Movie of the vertical position at the beam position monitor for bunch 1-10 at the six vertical pinger settings (sequence 204, 100, 46, 30, 20, 73cu).
  • movie: Movie of the horizontal spectrum for bunches 1-10 at the three horizontal pinger settings (sequence 124, 100, 150cu).
  • movie: Movie of the horizontal position at the beam position monitor for bunch 1-10 at the three horizontal pinger settings (sequence 124, 100, 150cu).
  • movie: Movie of the vertical spectrum for bunches 1-10 at the five vertical feedback settings (sequence -1000, -500, -250, -100, and 0cu).
  • movie: Movie of the vertical position at the beam position monitor for bunches 1-10 at the five vertical feedback settings (sequence -1000, -500, -250, -100, and 0cu).
  • movie: Movie of the horizontal spectrum for bunches 1-10 at the four horizontal pinger settings (sequence 1000, 500, 250, and 0 cu).
  • movie: Movie of the horizontal position at the beam position monitor for bunch 1-10 at the four horizontal feedback settings (sequence 1000, 500, 250, and 0cu).
  • movie: Movie of the horizontal spectrum for bunches 1-10 at the five different horizontal settings (sequence 216, 225, 231, 220, and 205kHz).
  • movie: Movie of the horizontal position at the beam position monitor for bunch 1-10 at the five different horizontal settings (sequence 216, 225, 231, 220, and 205kHz).
  • movie: Movie of the vertical spectrum for bunches 1-10 at the three different horizontal settings (sequence 237, 228, and 245kHz).
  • movie: Movie of the vertical position at the beam position monitor for bunch 1-10 at the three different vertical settings (sequence 237, 228, and 245kHz).

  • Results: e- Cloud Machine Studies-Tune Shift Studies 10/31/2008-ppt file
  • Results: e- Cloud Machine Studies-Tune Shift Studies 10/31/2008-pdf file
Quick Time Movies for 10/31/2008 results:
  • movie: Movie of the vertical spectrum for the various bunch trains starting with a 2 bunch train up to the 15 bunch train.
  • movie: Movie of the vertical position at the beam position monitor for the various bunch trains starting with the 2 bunch train up to the 15 bunch train.
  • movie: Movie of the horizontal spectrum for the various bunch trains starting with a 2 bunch train up to the 15 bunch train.
  • movie: Movie of the horizontal position at the beam position monitor for the various bunch trains starting with the 2 bunch train up to the 15 bunch train.

November 2008

  • Results: e+ 45 bunch train dynamics from 11/9/2008-ppt file
  • Results: e+ 45 bunch train dynamics from 11/9/2008-pdf file with movies

Quick Time Movies for 11/09/2008 results:

  • movie: Mean of the vertical position for a 45 bunch train over 5000 turns with I=0.75mA/bunch
  • movie: Movie of the mean vertical beam size for a 45 bunch train over 5000 turns with I=0.75mA/bunch
  • movie: Movie of the vertical distribution of bunch 4 (stable) in the 45 bunch
  • movie: Movie of the vertical distribution of bunch 27 (unstable) in the 45 bunch
  • movie: Mean of the vertical position for a 45 bunch train over 5000 turns with I=1mA/bunch
  • movie: Movie of the mean vertical beam size for a 45 bunch train over 5000 turns with I=1mA/bunch
  • movie: Mean of the vertical position for a 45 bunch train over 5000 turns with I=1.25mA/bunch
  • movie: Movie of the mean vertical beam size for a 45 bunch train over 5000 turns with I=1.25mA/bunch
  • movie: Movie of the vertical spectrum of each bunch in the 45 bunch train with I=0.75mA/bunch.
  • movie: Movie of the vertical position of each bunch at the beam position monitor for the 45 bunch train with I=0.75mA/bunch.
  • movie: Movie of the vertical spectrum of each bunch in the 45 bunch train with I=1mA/bunch.
  • movie: Movie of the vertical position of each bunch at the beam position monitor for the 45 bunch train with I=1mA/bunch.
  • movie: Movie of the vertical spectrum of each bunch in the 45 bunch train with I=1.25mA/bunch.
  • movie: Movie of the vertical position at the beam position monitor for the 45 bunch train with I=1.25mA/bunch.
  • movie: Movie of the horizontal spectrum of each bunch in the 45 bunch train with I=0.75mA/bunch.
  • movie: Movie of the horizontal position of each bunch at the beam position monitor for the 45 bunch train with I=0.75mA/bunch.
  • movie: Movie of the horizontal spectrum of each bunch of the 45 bunch train with I=1mA/bunch.
  • movie: Movie of the horizontal position of each bunch at the beam position monitor for the 45 bunch train with I=1mA/bunch.
  • movie: Movie of the horizontal spectrum of each bunch of the 45 bunch train with I=1.25mA/bunch.
  • movie: Movie of the horizontal position of each bunch at the beam position monitor for the 45 bunch train width I=1.25mA/bunch.
Topic revision: r8 - 17 Dec 2008, RobertHoltzapple
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding CLASSE Wiki? Send feedback