Tags

April 02, 2007 CESR-c Ecloud Results, e+,e- train with witness bunch (14 ns nominal bunch spacing); First 4 ns bunch spacing test

11 Dec 2024 - 01:55

Vertical tune data from BPM6W1 for witness bunch measurements (14 ns nominal bunch spacing)

  • PDF of e+ vertical tunes with witness bunches
  • PDF of e+ horizontal tunes with witness bunches
  • PDF of e- vertical tunes with witness bunches
  • PDF of e- horizontal tunes with witness bunches
  • e+/e- vertical dynamics with witness bunches here (pdf)
  • e+ tunes vs witness bunch (gif):
    ecloud tunes 070402 p.gif
  • e- tunes vs witness bunch (gif):
    ecloud tunes 070402 e.gif
  • e+ and e- tunes vs witness bunch (gif):
    ecloud tunes-070402 pe.gif
  • e+ 3d tune plot for excited beam:
    STD 00098676.GIF
  • e- 3d tune plot for excited beam:
    STD 00098677.GIF
  • e+ and e- tunes vs witness bunch (gif):
    ecloud tunes-070402 pe.gif
  • e- horizontal tune vs bunch 20 bunches:
    ECLOUD TUNES ALL 02115 1.gif

First 4 ns bunch spacing test with results from BPM6W1 and BSM

  • Timing scan results for 4 ns spacing can be found here (pdf)
Topic revision: r13 - 08 Jun 2007, EugeneTanke
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding CLASSE Wiki? Send feedback