Weekly Tuesday Inspection Checklist-CHESS IDLE
Operator on Shift:
All Secondary Gate Valves should be closed during Open Access
BEFORE Open Access Ends, verify tunnel lights are off at C, D, F lines and G cave and all doors on Terranova racks in tunnel are closed
Signals for the past week: (complete by 10am)
All 7 Day Buttons
Note Any Missing Signals
Print out plots of suspicious signals for distribution to the appropriate person
At Each Station and G-Cave:
Printout motor positions at each station, ops, and G-cave (prout we) & add printouts to binder in Ops
In the Tunnel: (complete by 10am)
Vacuum/clean around ends of undulator magnets, if they are installed (4 spots)
Water leaks
Ion pump controllers
Loose wires
Other obvious problems (look and listen)
Look for missing bus covers, alert CESR operator and post webboard and ELOG notes.
Turn off lights by C, D, and F lines and close all tunnel electronics racks as you go
At Operations
On EPICS Monitors:
Check for T.C. failures/overtemp
Check for ion pump trips
Check for disconnected signals/any other errors
Remove group dosimeter log sheets weekly and individual dosimeter log sheets when they are full from binder, give to Dwight Widger
Ensure broken equipment bench in ops is empty by either fixing equipment or giving to appropriate staff to fix
Vacuum computer fans & electronics
Misc. Stuff
Inventory Radiation Sources
Glovebox: Check display screen for any alerts or alarms (box normally operates between 1-5mbar). Report anything suspicious (unlabeled vials, spilled materials, etc)
Check ice machine in cold room  break up/empty out large chunks as necessary
Check chem. room for obvious problems
Run water through eye washes until it is clear. 4 locations: G line chem room, main chem room, CHESS Ops, room off of F1
Check door intercoms (5
th floor and loading dock)
Clear clutter from Ops/Prep area.
Post all of your findings to the Webboard
--
LeeShelp - 20 Feb 2017