From "Readme" file in USER$DISK: CESR.PALMER.TS101.BPM by E.Tanke ************ CESR BPM DAQ program (controls side) *********************************...
From "Readme" file in USER$DISK: CESR.PALMER.TS101.BSM by E.Tanke ...11 Jun 2007 *************************************************************************** *...
Minutes for June 2, 2006 * Mike Watkins: I now have a fitting code, written in C, which fits 125k turns of single bunch BSM data in about 10 minutes on CESR68....
October 2005 * October 05, 2005 BSM23W tune wobble measurements June 2005 * June 25, 2005 BSM23W single bunch turn by turn beamsize measurement (triggered ...
November 2006 * November 2, 2006 e /e Vertical Beam Dynamics during CHESS Operation * November 16, 2006 e /e Vertical Beam Dynamics during CHESS Operation...
Main.rlh 10 Jan 2008 January 2008 * Results: e PMT Calibration 1/9/2008 * Results: e PMT/Interferometer comparison 1/22/2008 February 2008 * Results:...
Second Generation (CBPM II) Software * Algorithms and Command / Control * Generalized DSP Executable * DSP Test Programs * General Utilities Developm...
CBPM II DSP Test Program Pairs This is a list of test program pairs to be used to exercise targeted functionality in the DSP. Each test requires a custom executa...
Sequence type encountered with 4 steps. *********************************************************** Install Turn By Turn Bunch = Multibunch Turn By Turn Data A...
Making Beam Measurements with CBPM II Devices This document pertains to running programs on VMS. Each hardware type has a directory named CESR.PALMER.TS101.{XX...
General Upload page for single snapshots of analyzed data General Machine Studies snapshots uploads by date 2006 * MS 2006 General studies snapshots 200...
******* RAW DATA ***** (l)oad predefined, (i)ndividual bunch selection, (r)ange of bunches Specify the bunch pattern entry method: l : input = l Avai...
e /e Vertical Beam Dynamics during CHESS Operation (9x6 bunch pattern, 9k turns of raw data) * MS11022006.ppt: Results ppt format without movies * MS110...
May 04, 2005 BSM23W beamsize for 7x5 pretzel on/off * Measurement results for different electron currents (no positrons) can be found in this pdf file Main.E...
Main.rlh 16 Oct 2006 * CHESS Vertical Beam Size During Normal Operations (9x5 bunch pattern, 10k turns of raw data, files 744 (e ) and 745 (e )) in this pdf fi...
May 10, 2005 BSM23W noise measurements (no beam and only positrons in machine) * Noise measurement results for no beam and positrons only (arranged in 9x5) can...
CHESS Turn by turn Vertical Beam Size During Normal Operations (9x5 bunch pattern, 10k turns of raw data) * CHESS Turn by turn results Main.rlh 01 Nov 2006
e /e Vertical Beam Dynamics during CHESS Operation (9x6 bunch pattern, 9k turns of raw data) Part 2 * MS11162006.ppt: Results ppt format without movies * M...
June 21, 2005 BSM23W beamsize measurements before and after rail displacement * Beamsize measurements before and after rail displacement can be found in this p...
June 23, 2005 BSM23W beamsize measurements after change of beamsplitter * Beamsize measurements after change of beamsplitter can be found in this pdf file Ma...
June 24, 2005 BSM23W single bunch turn by turn beamsize measurements * Single bunch turn by turn beamsize measurements can be found in this pdf file Main.Eug...
May 24, 2005 BSM23W noise measurements (disconnecting/reconnecting cables) * Noise measurement results for disconnected/reconnected HV and flat cable can be fo...
* Differential Coupling and Vertical Beam Size Study: e with e , e only, RF change * Results from turn by turn data * Results from averaged data (pp...
June 25, 2005 BSM23W single bunch turn by turn beamsize measurements (triggered by trigger bit 1) * Single bunch turn by turn beamsize measurements (triggered ...
February 27, 2006 BSM23W beam size measurements at the beginning and end of a CHESS run * Multi bunch beam size measurements at the beginning and end of a CHES...
May 31, 2005 BSM23W noise measurements (beam pipe window covered/not covered) * Noise measurement results for the beam pipe window covered/not covered can be f...
* Differential Coupling and Vertical Beam Size Study: e with e , e only, V tune change * Results from turn by turn data with movies (pdf) * Results ...