Proposed Element Naming Convention for CBETA All element names will use 8 characters All characters will be upper case. Format: *TSSCCCNN*_signal_name where: T =...
CBETA Equipment Protection System Beam Mode 1 Gun Only *Responsible personnel: *Date: February xx, 2019 Beam Mode 1 Description This beam mode is for testing...
CBETA Equipment Protection System *Responsible personnel: Nalanjan Banerjee, Adam Bartnik, John Dobbins, Karl Smolenski, Rob Michnoff, and others*Date: February x...
CBETA FFAG Magnets and Girders Halbach Magnet Measurement and Tuning * Summary results of production run (Stephen Brooks): CBETA note 035 * Magnet measurem...
CBETA System Tests Bunch Arrival Monitors *Responsible personnel: Rob Michnoff, John Dobbins*Date: February xx, 2019 Description of test Confirm that all EPICS...
CBETA System Tests BPMS *Responsible personnel: Rob Michnoff, Rob Hulsart*Date: February xx, 2019 Description of test Confirm that all EPICS IOC names communic...
CBETA System Tests FFA Corrector Power Supplies and Magnetic Field Checks * Responsible personnel: xxxx * Date: February xx, 2019 Description of test Con...
CBETA System Tests Bunch Pattern Generator *Responsible personnel: Rob Michnoff, John Dobbins*Date: February xx, 2019 Description of test Confirm that all EPIC...
CBETA System Tests Splitter Power Supply and Magnetic Field Checks * Responsible personnel: xxxxx * Date: February xx, 2019 Description of test Confirm t...
Main.AdamBartnik 07 Mar 2018 The CBETA accelerator will be assembled and commissioned in phases according to the following plan: 1 MLC test * Commissioni...
CBETA Commissioning Planning The commissioning schedule has a portion for scientific plans and a portion for staffing. It can be found at https://docs.google.com/...
Lead Operator (LO) A lead operator is highly experienced at operating CBETA and is fully qualified for any CBETA operation. The lead operator has primary control ...
Support Operator (SO) The support operator is a partner and in safety terms the second person to the LO. Typically the SO will provide operational support to the ...
Technical Support Expert (TSE) Technical experts on CBETA subsystem that may be required in the control room, but who are not directly running the accelerator. Fo...
The primary project goal is to provide 4 pass acceleration of 1 mA beam to 150 MeV, then decelerate in 4 passes and dump. The energies are defined as follows: ...