CBETA-Controls-NamingConvention
Proposed Element Naming Convention for CBETA All element names will use 8 characters All characters will be upper case. Format: *TSSCCCNN*_signal_name where: T =...
r8 - 19 Dec 2019 - 13:47 by StephenBrooks
CBETA-EPS-gun-only
CBETA Equipment Protection System Beam Mode 1 Gun Only *Responsible personnel: *Date: February xx, 2019 Beam Mode 1 Description This beam mode is for testing...
CBETA-Equipment-Protection-System
CBETA Equipment Protection System *Responsible personnel: Nalanjan Banerjee, Adam Bartnik, John Dobbins, Karl Smolenski, Rob Michnoff, and others*Date: February x...
CBETA-FFAG-Magnets-and-Girders
CBETA FFAG Magnets and Girders Halbach Magnet Measurement and Tuning * Summary results of production run (Stephen Brooks): CBETA note 035 * Magnet measurem...
CBETA-System-Tests-BAMs
CBETA System Tests Bunch Arrival Monitors *Responsible personnel: Rob Michnoff, John Dobbins*Date: February xx, 2019 Description of test Confirm that all EPICS...
CBETA-System-Tests-BPMs
CBETA System Tests BPMS *Responsible personnel: Rob Michnoff, Rob Hulsart*Date: February xx, 2019 Description of test Confirm that all EPICS IOC names communic...
CBETA-System-Tests-FFA-correctors
CBETA System Tests FFA Corrector Power Supplies and Magnetic Field Checks * Responsible personnel: xxxx * Date: February xx, 2019 Description of test Con...
CBETA-System-Tests-bunch-pattern-generator
CBETA System Tests Bunch Pattern Generator *Responsible personnel: Rob Michnoff, John Dobbins*Date: February xx, 2019 Description of test Confirm that all EPIC...
CBETA-System-Tests-splitter-magnets
CBETA System Tests Splitter Power Supply and Magnetic Field Checks * Responsible personnel: xxxxx * Date: February xx, 2019 Description of test Confirm t...
r3 - 08 Oct 2019 - 13:57 by trbojevic
CommissioningPlan
Main.AdamBartnik 07 Mar 2018 The CBETA accelerator will be assembled and commissioned in phases according to the following plan: 1 MLC test * Commissioni...
CommissioningPlanning
CBETA Commissioning Planning The commissioning schedule has a portion for scientific plans and a portion for staffing. It can be found at https://docs.google.com/...
LO
Lead Operator (LO) A lead operator is highly experienced at operating CBETA and is fully qualified for any CBETA operation. The lead operator has primary control ...
OutstandingIssues
Ideas for Scripts * Orbit correction (Colwyn) * Twiss correction at EMS. (Adam, use GPT?) * Degaussing magnets * Cavity alignment * Magnet alignmen...
Pre-BeamCommissioningStatus
October 8th, 2019 PRE BEAM COMMISSIONING * SYSTEMS COMMISSIONING: * Splitter magnets (David Burke and Jim Crittenden): * Elytt magnets (David Bu...
NEW - 08 Oct 2019 - 15:16 by trbojevic
SO
Support Operator (SO) The support operator is a partner and in safety terms the second person to the LO. Typically the SO will provide operational support to the ...
TSE
Technical Support Expert (TSE) Technical experts on CBETA subsystem that may be required in the control room, but who are not directly running the accelerator. Fo...
TrainingOperations
Safety Procedures * Safety Layout (Picture with reset / lightbeam / e stop locations) * Search and Secure * Interlock Checkout Operation Procedures *...
r18 - 03 Feb 2020 - 14:34 by kd324
WebHome
The primary project goal is to provide 4 pass acceleration of 1 mA beam to 150 MeV, then decelerate in 4 passes and dump. The energies are defined as follows: ...