March 15, 2006 Ecloud electrons 8x3 and 6x5 beam size measurements * Ecloud electrons 8x3 and 6x5 beam size measurements are in this pdf file Main.EugeneTank...
February 27, 2006 BSM23W beam size measurements at the beginning and end of a CHESS run * Multi bunch beam size measurements at the beginning and end of a CHES...
October 2005 * October 05, 2005 BSM23W tune wobble measurements June 2005 * June 25, 2005 BSM23W single bunch turn by turn beamsize measurement (triggered ...
July 2005 * Jul 26, 2005 Electron damping time measurements * Jul 21, 2005 Electron damping time measurements under CHESS conditions * Jul 20, 2005 Elect...
June 25, 2005 BSM23W single bunch turn by turn beamsize measurements (triggered by trigger bit 1) * Single bunch turn by turn beamsize measurements (triggered ...
June 24, 2005 BSM23W single bunch turn by turn beamsize measurements * Single bunch turn by turn beamsize measurements can be found in this pdf file Main.Eug...
June 23, 2005 BSM23W beamsize measurements after change of beamsplitter * Beamsize measurements after change of beamsplitter can be found in this pdf file Ma...
June 21, 2005 BSM23W beamsize measurements before and after rail displacement * Beamsize measurements before and after rail displacement can be found in this p...
May 31, 2005 BSM23W noise measurements (beam pipe window covered/not covered) * Noise measurement results for the beam pipe window covered/not covered can be f...
May 24, 2005 BSM23W noise measurements (disconnecting/reconnecting cables) * Noise measurement results for disconnected/reconnected HV and flat cable can be fo...
May 04, 2005 BSM23W beamsize for 7x5 pretzel on/off * Measurement results for different electron currents (no positrons) can be found in this pdf file Main.E...
May 10, 2005 BSM23W noise measurements (no beam and only positrons in machine) * Noise measurement results for no beam and positrons only (arranged in 9x5) can...
Minutes for June 2, 2006 * Mike Watkins: I now have a fitting code, written in C, which fits 125k turns of single bunch BSM data in about 10 minutes on CESR68....
BSM23W Electronic Log Entry 08 March 2006 March 2006 March 8, 2006 Attempt to Realign e Synchrotron Light Monitor Optics (MAP/EPT/RME/RNC/LMW) * 10:40 ...
Meeting 29 April 2005 2pm Minutes Attendees: Codner, Li, Love, Palmer, Strohman, Schwarthoff, Watkins, Wilksen Beam Size Monitor is installed Mark gave a brief ...
Minutes for May 19, 2006 * Mike Watkins: The fitting code now works and has been used this week for machine studies involving the BSM. Have started to write so...
Minutes for March 24, 2006 * lnx180c now has 1 GBit ethernet to public side in addition to existing ethernet to CESR * /nfs/cesr/instr is a 36GB mount p...
ERL Stripline Development Feedthrough and Stripline R D * stripline2.xls: Stripline Design Spreadsheet * ERL_BPM_Specifications.doc: ERL BPM Specifications...
BPM Detector Issues #BrokenBPM1W Ongoing issues with BPM 1W (Nov Dec 2005) BPM 1W Overview * This is a 6 button detector on the large round beampipe outside ...
Meeting 06 May 2005 2:15pm Minutes Attendees: Strohman, Schwarthoff, Palmer, Li, Tanke, Wilksen, Watkins, Alexander, Rice Assignments for the next two weeks: ...
Schedule for the CESR Bunch by Bunch Instrumentation DAQ Project This page gives a very rough overview of the project schedule and timeline. * Status: 5 Apr 20...