Monday |
Tuesday |
Wednesday |
Thursday |
Friday |
edit |
Date |
30 May 2022 |
31 May 2022 |
01 Jun 2022 |
02 Jun 2022 |
03 Jun 2022 |
edit |
Shutdown Manager |
Gallagher |
Gallagher |
Sabol |
Gallagher |
Gallagher |
edit |
General |
Memorial Day |
|
|
|
|
edit |
|
|
|
|
|
|
edit |
CHESS |
|
|
|
|
|
edit |
CESR |
|
Open vacuum west flare |
|
|
|
edit |
RF |
|
|
|
|
|
edit |
NEH Construction |
|
CIT work on new S7 cable for network and fire alarm. Start 10:30 |
|
|
|
edit |
|
|
|
|
|
|
edit |
Electrical |
|
Complete Sync & CESR Magnet Decommissioning |
|
|
|
edit |
Vacuum |
|
Vented S Arc S4, S5 and S6 to N2 |
|
|
|
edit |
Water Systems |
CESR85 Off |
CESR85 Off |
CESR85 Off |
CESR85 Off |
CESR85 Off |
edit |
Cryogenic System |
|
Refrigerator C clean-up/maintenance |
Refrigerator C clean-up/maintenance |
Refrigerator C clean-up/maintenance, Sector 7 Ln2 line removal |
Refrigerator C clean-up/maintenance |
edit |
|
|
|
|
|
|
edit |
|
|
|
|
|
|
edit |
|
|
|
|
|
|
edit |
Rigging and Material Handling |
|
|
|
|
|
edit |
Facilities |
|
|
|
|
|
edit |
Safety |
|
|
Start: L0 and Tunnel are non-controlled areas, south of 15W/E gates |
|
|
edit |
Tours |
|
|
|
|
|
edit |
Electrical - All |
|
Complete Sync & CESR Magnet Decommissioning |
|
|
|
edit |
Electrical - Holic |
|
W. Flare Remove W.R13/W.R14 Rack and wiring |
W. Flare Remove W.R13/W.R14 Rack and wiring |
W. Flare Remove W.R13/W.R14 Rack and wiring |
W. Flare Remove W.R13/W.R14 Rack and wiring |
edit |
Electrical - Contractor |
|
S7 Temp power conduit run from L5 |
S7 Temp power conduit run from L5 |
S7 Temp power conduit run from L5 |
S7 Temp power conduit run from L5 |
edit |
Electrical - Contractor |
|
RM128.B11 Pathway |
RM128.B11 Pathway |
RM128.B11 Pathway |
RM128.B11 Pathway |
edit |
Electrical - Brown |
|
Accelerator Crash |
Disconnect dipole bus from girders |
Disconnect dipole bus from girders |
Disconnect dipole bus from girders |
edit |
Electrical - Miller/Drake |
|
Remove W. Flare Radiation Control Wiring |
Remove W. Flare Radiation Control Wiring |
Remove W. Flare Radiation Control Wiring |
Remove W. Flare Radiation Control Wiring |
edit |
Electrical - Brown |
|
Disconnect 120v power from W. Flare girders |
Cut calibration winding |
HV conduits removal to undulators |
HV conduits removal to undulators |
edit |
Electrical - Contractor |
|
Temp Power W. Cavity |
Temp Power W. Cavity |
Temp Power W. Cavity |
Temp Power W. Cavity |
edit |
Electronics Shop (west flare) |
|
Disconnect magnet controls, xbus i/o cabling, vac hv, etc. Secure all cables in overhead trays |
Disconnect magnet controls, xbus i/o cabling, vac hv, etc. Secure all cables in overhead trays |
Disconnect magnet controls, xbus i/o cabling, vac hv, etc. Secure all cables in overhead trays |
Disconnect magnet controls, xbus i/o cabling, vac hv, etc. Secure all cables in overhead trays |
edit |
Electronics Shop |
|
List of Cesr magnet issues |
List of Cesr magnet issues. Install High Level input interfaces at L1, L2, L3, L4, L5. |
List of Cesr magnet issues. Install High Level input interfaces at L1, L2, L3, L4, L5. |
List of Cesr magnet issues. Install High Level input interfaces at L1, L2, L3, L4, L5. |
edit |
|
|
|
|
|
|
edit |