Weekly Tuesday Inspection Checklist CHESS IDLE Operator on Shift: All Secondary Gate Valves should be closed during Open Access BEFORE Open Access Ends, verify...
Weekly Tuesday Inspection Checklist CHESS RUNNING Operator on Shift: q BEFORE Open Access begins, close all Secondary Gate Valves q BEFORE Open Access ends, veri...
Weekly Tuesday Inspection Checklist CHESS RUNNING Operator on Shift: qBEFORE Open Access begins, close all Secondary Gate Valves qBEFORE Open Access ends, verify...
Cornell High Energy Synchrotron Source Doc#:SOP OPS 005 Procedure: Securing CHESS East and West Prepared by: KMM Rev.: 4 Revision Date: 11/2/16 Date Ef...
Cornell High Energy Synchrotron Source Doc#: SOP OPS 008 Procedure: CHESS End of Run Procedure Prepared by: ZB, KM Rev.: 1 Revision Date: 05/31/12 Date...
Cornell High Energy Synchrotron Source Doc#: SOP OPS 013 Procedure: Purchasing a helium crib Prepared by: KM Rev.: 4 Revision Date: 09/17/15 Date Effec...
Cornell High Energy Synchrotron Source Doc#: SOP OPS 014 Procedure: F2 Cryo System Prepared by: EE Rev.: 2 Revision Date: 02/05/14 Date Effective: 02/0...