Once David Rubin provides a gain calibration file to update BPM gains, use the ln command to create a symbolic linkfirst use the mv command like this:mv gain_cal_...
Would you like to apply the gain mapping corrections from the file ./gain_cal_mapping.in to existing parameters for all instruments COMMON to the master paramet...
Copying and transferring structure set... Post function loop... Instrument heartbeat: OK! Timing integrity : GOOD Turns seen: 39013 INFO 07/28/14 15...
Timing setup is presently: 5 14ns_FIX_G ******************************************** This mirrors all block A timing values into timing block B for efficien...
********************************************** This mirrors all block A timing values into timing block B for efficiency in acqiring calibration data. The und...
Prep() function status = 0 Copying and transferring structure set... Initializing command... Executing command... Waiting for handshake completion... CMD_D...
Copying and transferring structure set... Post function loop... INFO 07/28/14 15:18:53 : = DUMP RAW DATA Command Status Summary = Instrument Location ...
Timing setup is presently: 5 14ns_FIX_G ******************************************************* This shifts the waveform sample point on BLOCK A and B for a...
Sequence type encountered with 4 steps. *********************************************************** Install Turn By Turn Bunch = Multibunch Turn By Turn Data A...
INFO cbi_cesr_interface: CBPM CONTROL INTERFACE ACTIVE INFO 07/28/14 15:13:38 cbi_cesr_interface: exits server mode ^C INFO cbi_cesr_interface: Exiti...
******* FIND BLOCK TURN MARKER DELAY ****** Will use cached channel delays. Checking timing setup of the first active device. Startup checks shall have ensured ...
********FIND BUNCH**************** Channel delays are being set on the instrument. Enter species POSITRONS=0, ELECTRONS=1 0 : species = (0) POSITRONS Enter num...
******* GET BETATRON PHASE ***** This will calculate the betatron phase coefficients for a single bunch of either species, and generate setup/comparison coeffic...
******* PROCESSED DATA ***** Enter species POSITRONS=0, ELECTRONS=1 0 : species = (0) POSITRONS Enter the number of each bunch you wish to examine, each foll...
Copying and transferring structure set... Initializing command... Executing command... Waiting for handshake completion... CMD_DONE (3) Post function loop...
******* RAW DATA ***** (l)oad predefined, (i)ndividual bunch selection, (r)ange of bunches Specify the bunch pattern entry method: l : input = l Avai...
Copying and transferring structure set... Initializing command... Executing command... Waiting for handshake completion... CMD_DONE (3) Post function loop....
Would you like to replace all gain tables in the existing set of parameters with those that appear in the file ./gain_cal_electronic.in and save the result to a...
Would you like install the changes present in file: /nfs/cesr/online/instr/CBPM/config/09/instrument_parameters.009780 into the master operational parameters f...
. Top Level Functions Function Name AcquireAndShowXFERData Acquire data from $CESR_OFFLINE\instr\anal\cbpmII\diag\XFER_BPM_Matlab_Data, and plot it. ...
Sequence type encountered with 6 steps. Would you like to cycle power for ALL active instruments? (y/n): n : y Turning off power to all active instruments... Wai...
Would you like to begin the flash programming process for ALL active instruments? (y/n): n : y Prep() function status = 0 Copying and transferring structure set...
RTEMS Coldfire Development Environment on the CESR Control System Overview Instrumentation in the CESR control system frequently uses the RTEMS operating system ...
Sequence type encountered with 5 steps. Skipping communication connect! Copying and transferring structure set... Post function loop... INFO 07/28/14 15:26:...
Copying and transferring structure set... Post function loop... Closing all open sockets to instruments. Resetting the Coldfire/CBInet server via XBUS for instru...
Would you like to save the pedestal tables to an intermediate file? (y/n): n : y MailboxID = 0 Saving pedestal tables to intermediate file: /nfs/cesr/online/ins...
Would you like to save the timing parameters to an intermediate file? (y/n): n : y MailboxID = 0 Saving timing parameters to intermediate file: /nfs/cesr/online...
Enter timing block to scrub block A = 0, block B = 1 : Prep() function status = 0 Copying and transferring structure set... Post function loop... TIMING setu...
********* SET GAIN ************* All channels will be set to the same gain. Enter a gain setting index between 1 and 10 inclusive 4 : Prep() function status =...
How To Setup Coldfire 1. Place the Coldfire board into DIMM slot on the I/O Board. 2. Plug the XBUS/MOXA cable, Ethernet, and Power all into the I/O Bo...
Ensure there is no beam in CESR On first the West, then the East: 1 ACQUIRE PEDESTAL(19) 1 SAVE PEDESTAL PARAMETERS(10) 1 INSTALL UPDATED PARAMETERS(23) ...
******* TEST RAW DATA ******** Enter value to use for scrubbing 123 : Prep() function status = 0 Copying and transferring structure set... Initializing comm...
Prep() function status = 0 Copying and transferring structure set... Post function loop... INFO 07/28/14 16:28:28 : = Test Life Command Status Summary = I...
Sequence type encountered with 8 steps. Select the desired timing conditions: 1 = Positrons, 4nSec, timing block A Variable Gain 2 = Positrons, 4nSec, tim...
... Take Pedestals. Save and install them. Load T1B1 Positrons (14nS LDINIT), Fill to 0.75 mA, turn Separators OFF Time in 14ns_FIX_G (Block A), Save Timing...
https://cesrwww.lepp.cornell.edu/logs/Instrumentation/895 Diagnostic output from running cbic with the " h" flag: TimeScanDiagnosticsDocOutput.txt Time_Scan_Erro...
... CBIC Function tree (incomplete), might have useful info for understanding this page: https://wiki.classe.cornell.edu/ACC/Bunch/FunctionTree ... CBIC Start Cy...